Loading...
HomeMy WebLinkAboutAlpha Testing - 6/20/20185058 Brush Creek Road Fort Worth, Texas 76119 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. June 20, 2018 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Attention: Ms. Calva Powell Re: Field Inspection of Structural Steel Mustang Panther Stadium Pkg A & Pkg B Grapevine, Texas ALPHA Report No. F171917-307 Alpha Testing arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results of the inspection are as follows: I Column Anchor Bolt Connections - Upper Concourse Structural Framing – lines G.2 to F.1 & 1 to 11: A. Anchor bolt connections were inspected per detail 9/S3.1 with no discrepancies found at time of inspection. Connections were properly tensioned. Compliant. II A325/TCA325 Beam to Beam and Beam to Column Bolted Connections - Upper Concourse Structural Framing – lines G.2 to F.1 & 1 to 11: A. Bolted Connections were inspected per sheet S6.8 and “Connections” general notes 6(B) and 6(E). Per note 6(E) bolts shall be tension control bolts. Note 6(B) references A325 type N bolts. Contractor has installed TCA325 and A325N bolts. Connections have been tensioned to a snug tight condition. TCA325 have not been snapped. Will require clarification from EOR on bolting requirements. Non- Compliant. III (8”x4”x7/16”) angle to pre-cast anchor bolt and welded connections and (5”x5”x5/16) angle to pre- cast and beam anchors bolt and welded connections - Upper Concourse Structural Framing – lines G.2 to F.1 & 1 to 11: A. Connections were inspected per details 1/S3.5, 23/S3.5, 1/E11 and 5/E11 with no discrepancies found at time of inspection. Compliant. IV Brace Frame Welded Connections - Upper Concourse Structural Framing – lines G.2 to F.1 & 1 to 11: A. Visually inspected the brace frame welded connections (BF-8 and BF-7) were inspected per sheet S6.8,sheet S8.2 and detail 5/S8.2, 9/S8.2, 10/S8.2 and 11/S8.2 with no discrepancies found at time of inspection. Compliant. V Kicker Angle A325 Bolted Connections- Upper Concourse Structural Framing – lines G.2 to F.1 & 1 to 11: A. Connections were inspected per details 4/E11 and 3/S7.10 with no discrepancies found at time of inspection. Compliant. 5058 Brush Creek Road Fort Worth, Texas 76119 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. ALPHA Report No. F171917-307 VI Coil Bolt to Coil Insert (Pre-Cast Seating) – Bleachers – Upper Concourse Structural Framing – lines G.2 to F.1 & 1 to 11: A. Connections were inspected per pre-cast details 14/PC04 and 12/PC04. Coil bolt were installed per drawings. *Discrepancies, if any, are noted above in bold. INSPECTOR: Chris Lalic CWI#16010691 We are pleased to be of service on this project and if you have any questions, please contact our office. Sincerely yours, ALPHA TESTING, INC. Tim Begole Sr. Project Manager