HomeMy WebLinkAboutAlpha Testing - 7/16/2018 (2)Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Tim Begole Sr.
Remarks:Improper cover and placement - Corrected; Improperly tied in various places - Corrected; Top grid improperly tied - Corrected
Respectfully Submitted,
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
X
Cable/Tendon Drape
Cable/Tendon Count &
Spacing
Based on the representative's visual observation using the provided project plans, the area was compliant
Reinforcement Tied Properly X Stirrup Spacing X
X Sheathing X
PT Drawings X
Bar Length & Spacing X
Correct Splicing X
Dowels in Place X
Stirrup Size X
XGrade Beam / Column Size
Proper Placement X
Size of Reinforcement X Proper Support
X
X
Number of Reinforcement X Form Clean X
Grade Reinforcement X Reinforcement Clean
N/A
•Date:6/12/2017 / 4/30/2018 / 5/31/2017
Observation Information
Drawings Approved X Proper Cover X
•Detail Sheet:P6 / R-19 / P9
Item Observed Correct Not Correct N/AItem Observed CorrectNot Correct
•Plan Sheet:P6 / RW1.12 / P9
The representative utilized the following provided project plans to perform the observation:
•Retaining Wall 9A at Stations 3+30 to 3+92
•Northside Ticket Booth
The representative observed the reinforcing steel related items for the following area:
•24' Concourse for Press Box Slab-on-Deck
Page Number:1 of
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
1
Work Order Number:425040
Project:Mustang Panther Stadium Pkg A & Pkg B Project Number:F171917
Grapevine, Texas
Technician:Scott, Clinton
Client:Grapevine - Colleyville ISD Service Date:07/16/2018
7/24/2018
Grapevine, TX 76051 Weather:Clear
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
30510 Ira E Woods Ave Report Date: