Loading...
HomeMy WebLinkAboutAlpha Testing - 8/10/20185058 Brush Creek Road Fort Worth, Texas 76119 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. August 10, 2018 Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 Attention: Ms. Calva Powell Re: Field Inspection of Structural Steel Mustang Panther Stadium Pkg A & Pkg B Grapevine, Texas ALPHA Report No. F171917-386 Alpha Testing arrived on site to perform a Visual Structural Steel Inspection for the above referenced project. Results of the inspection are as follows: I Composite Floor Deck and Nelson Studs – Intermediate Level 2 Lines 4-2 and E.5-A Sheet S6.2: A. Type 2VLI 20gauge decking was secured in compliance with the “Vulcraft Deck Fastening Schedule” on sheet D1. D6 and sheet D7. The decking was fastened to the supports with 5/8” puddle welds per detail. Side laps were button punched per detail. Compliant. B. Nelson studs were inspected per details on sheet ST6 “Stud Layout” with no discrepancies found at time of inspection. Compliant. II Composite Floor Deck and Nelson Studs – Level 1 –Lines 11.1-.03 and A-G Sheet S6.4: A. Type 2VLI 20gauge decking was secured in compliance with the “Vulcraft Deck Fastening Schedule” on sheet D1. D6 and sheet D7. The decking was fastened to the supports with 5/8” puddle welds per detail. Side laps were button punched per detail. Compliant. B. Nelson studs were inspected per ‘Stud Layout” details with no discrepancies found at time of inspection. Compliant. III Angle to CMU Wall Anchors and Welded Connections- Level 1- Lines 11.1-.03 and A-G: A. Angle has been secured into CMU Blocks wall with Hilti anchors where required and welded connections have been inspected to AWS D1.1 with no discrepancies found at time of inspection. Compliant. IV Perimeter Angle Welded Splices and Welded Securement – Level 1 – Lines 11.1-03 and A-G: A. All weldments including splices have been performed to detail with acceptable welds to AWS D1.1. Compliant. V Brace frame welded and A325 bolted connections – Level 1 – Lines 0.13-11.1 and B-F: A. Welded connections were re-inspected per details 1, 2, and 3 on sheet S8.1. Connections we welded to AWS D1.1 with no discrepancies found at time of inspection. Compliant. *Note: This clears item 3a from report dated August 3rd, 2018. *Discrepancies, if any, are noted above in bold. INSPECTOR: John Butler CWI#18011071 5058 Brush Creek Road Fort Worth, Texas 76119 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Our test results and reports are for the exclusive use of the client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. ALPHA Report No. F171917-386 We are pleased to be of service on this project and if you have any questions, please contact our office. Sincerely yours, ALPHA TESTING, INC. Tim Begole Sr. Project Manager