Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct.
N/A
N/A
Dry
54.52
55.60
17.00
43.80
38.00 28.80
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Cased Depth (ft.)
Total Depth of Drilled Pier From
Ground (ft.)
36
98.00
Condition of Bottom (Wet or Dry)
Pier Diameter (in.)
96.92
Lee Lewis Construction
Building/Structure Identification
Measured Depth From Ground Level
To Top Of Concrete (ft.)
Casing Diameter (in.)
Depth From Top Of Concrete To
Bottom Of Pier (ft.)
Top of Ground Elevation (ft.)
Top of Pier Elevation (ft.)
Depth of Bearing Stratum From
Ground (ft.)
Project:
PB38
Client:
General Contractor:
Pier Identification
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016)
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
Tim Begole Sr.
PB37
36
98.59
28.50
98.59
96.92
46.00
Remarks:
Respectfully Submitted,
Actual Penetration (ft.)
PB17
24
Required Penetration (ft.)15.0017.0017.0017.00
15.30
1.67
42.13
N/A
PB24
36
98.34
96.92
29.00
46.70
Dry
N/A
96.92
17.70
1.42
96.92
29.00
46.00
N/A
44.33
Dry
N/A
45.28
PB25
36
98.00
96.92
28.00
45.20
PB16
36
98.34
Vertical Bar Size (#)8 8
N/A
17.00
17.00
1.42
8 8
N/A
17.20
1.67
17.60
1.08
Dry
N/A
17.20
1.08
44.12
DryDry
13
8 6
13 8
N/A
44.58
N/A
N/A
Length of Vertical Bars (ft.)54.70 43.80 44.80
Number of Vertical Bars (each)13 13 13
Stirrup Size (#)4 4 4 4
45.00 45.0043.80
4 4
Time Drilling Was Completed 9:24 AM 10:05 AM 11:05 AM 12:30 PM
12 12
1:40 PM 2:37 PM
Stirrup Spacing (in.)12 12 12 12
F171917
Yes Yes
Drilling Contractor:Wylie Drilling
Time Concrete Was Placed 1:45 PM 11:40 AM 11:45 AM
Grapevine - Colleyville ISD
30510 Ira E Woods Ave
Grapevine, TX 76051
01/24/2018
1/29/2018
Alpha Testing, Inc.
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Drilled Straight Shaft Pier
Observation Report
Mustang Panther Stadium
Service Date:
Report Date:
Weather:
Work Order Number:
Project Number:
Clear
350721
Yes Yes Yes
3:50 PM2:23 PM
Billingsley, Ernest (Alan)Technician:
Grapevine, Texas
4:05 PM
Page Number:1 of1
Concrete Placed Same Day (Yes or
No)Yes