Loading...
HomeMy WebLinkAboutAlpha Testing - 1/24/20181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Statement: If elevations are provided, they were provided by OTHERS and assumed to be correct. N/A N/A Dry 54.52 55.60 17.00 43.80 38.00 28.80 Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Cased Depth (ft.) Total Depth of Drilled Pier From Ground (ft.) 36 98.00 Condition of Bottom (Wet or Dry) Pier Diameter (in.) 96.92 Lee Lewis Construction Building/Structure Identification Measured Depth From Ground Level To Top Of Concrete (ft.) Casing Diameter (in.) Depth From Top Of Concrete To Bottom Of Pier (ft.) Top of Ground Elevation (ft.) Top of Pier Elevation (ft.) Depth of Bearing Stratum From Ground (ft.) Project: PB38 Client: General Contractor: Pier Identification approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-008(8/2/2016) Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Tim Begole Sr. PB37 36 98.59 28.50 98.59 96.92 46.00 Remarks: Respectfully Submitted, Actual Penetration (ft.) PB17 24 Required Penetration (ft.)15.0017.0017.0017.00 15.30 1.67 42.13 N/A PB24 36 98.34 96.92 29.00 46.70 Dry N/A 96.92 17.70 1.42 96.92 29.00 46.00 N/A 44.33 Dry N/A 45.28 PB25 36 98.00 96.92 28.00 45.20 PB16 36 98.34 Vertical Bar Size (#)8 8 N/A 17.00 17.00 1.42 8 8 N/A 17.20 1.67 17.60 1.08 Dry N/A 17.20 1.08 44.12 DryDry 13 8 6 13 8 N/A 44.58 N/A N/A Length of Vertical Bars (ft.)54.70 43.80 44.80 Number of Vertical Bars (each)13 13 13 Stirrup Size (#)4 4 4 4 45.00 45.0043.80 4 4 Time Drilling Was Completed 9:24 AM 10:05 AM 11:05 AM 12:30 PM 12 12 1:40 PM 2:37 PM Stirrup Spacing (in.)12 12 12 12 F171917 Yes Yes Drilling Contractor:Wylie Drilling Time Concrete Was Placed 1:45 PM 11:40 AM 11:45 AM Grapevine - Colleyville ISD 30510 Ira E Woods Ave Grapevine, TX 76051 01/24/2018 1/29/2018 Alpha Testing, Inc. 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Drilled Straight Shaft Pier Observation Report Mustang Panther Stadium Service Date: Report Date: Weather: Work Order Number: Project Number: Clear 350721 Yes Yes Yes 3:50 PM2:23 PM Billingsley, Ernest (Alan)Technician: Grapevine, Texas 4:05 PM Page Number:1 of1 Concrete Placed Same Day (Yes or No)Yes