HomeMy WebLinkAboutAlpha Testing - 2/28/2019 (2)riLJ
February 28,2019
Ms.Calva Powell
Grapevine-Colleyville ISD
3051 Ira E Woods Ave
Grapevine,TX 76051
Re: Mustang Panther Stadium Package A—Concessions Buildings B&C
Grapevine-Colleyville ISD
Grapevine,TX
Dear Ms.Calva Powell,
Based on independent laboratory observation reports from ALPHA Testing and site observations by
others on Huckabee's Staff,I believe that the structural construction of the Mustang Panther Stadium,
Package A—Concessions Buildings B&C generally conform with the structural documents issued by
Huckabee&Associates, Inc.for the above referenced project. And,I am not aware of any outstanding
structural issues.
Sincerely,
19EOF
A-
Ble n Harris, P.E. 7 I
Huckabee BENCH MARK HENRY HARRIS•k
Vice President of Engineering j.o; 89307 i
Structural Engineer of Record 1 0'•• /O
Enclosure:
Testing Summary Letter—ALPHA Report No. F1 71917-523262-Rev
F-I Z5Z
Huckabee
AUSTIN • DALLAS • FORT WORTFI • HOUSTON • WACO
www.huckabee-inc.com