Loading...
HomeMy WebLinkAboutAlpha Testing - 2/28/2019 (2)riLJ February 28,2019 Ms.Calva Powell Grapevine-Colleyville ISD 3051 Ira E Woods Ave Grapevine,TX 76051 Re: Mustang Panther Stadium Package A—Concessions Buildings B&C Grapevine-Colleyville ISD Grapevine,TX Dear Ms.Calva Powell, Based on independent laboratory observation reports from ALPHA Testing and site observations by others on Huckabee's Staff,I believe that the structural construction of the Mustang Panther Stadium, Package A—Concessions Buildings B&C generally conform with the structural documents issued by Huckabee&Associates, Inc.for the above referenced project. And,I am not aware of any outstanding structural issues. Sincerely, 19EOF A- Ble n Harris, P.E. 7 I Huckabee BENCH MARK HENRY HARRIS•k Vice President of Engineering j.o; 89307 i Structural Engineer of Record 1 0'•• /O Enclosure: Testing Summary Letter—ALPHA Report No. F1 71917-523262-Rev F-I Z5Z Huckabee AUSTIN • DALLAS • FORT WORTFI • HOUSTON • WACO www.huckabee-inc.com