Loading...
HomeMy WebLinkAboutECS 3/21/2019 (3)Change this name 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682)350-2250 [Phone] (817)847-8616[Fax] March 23, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 ATTN: Mr. A.L. Burtin LETTER OF TRANSMITTAL RE: Grapevine Station North -Phase 1 ECS Job # 63:1045 Permits: Location: E. Northwest Hwy. and Texan Trl. Grapevine, TX We are enclosing: X Field Reports X For your use X As requested CC: Westwood Group Development No. 11 - Randy Sawey City of Grapevine - Scott Cannon Les Daigh Excavating and Demolition - Les Daigh Westwood Group Development No. 11 - Taylor City of Grapevine - Donald Dixson Hazlewood Acadia Capital Group - Brad Catlett ENCL Field Report # 4R 03/21/2019 Report 4 Revision /SoEr, . ............. NTJOSEPH ELIZARDE ..... v !� MAR 212019 Vince Elizarde Eli Wood Principal Engineer Construction Materials Dept. Manager 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 4. Incomplete or non -conforming work will be recorded for future resolution. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reportsldocuments 1000.1 Transmittal Page 1/6 [Change this namel 4050, Drive, Suite 500 Fort Worth, TXX M e (682)350-2250 [Phone] (817)847-8616 [Fax] Project Grapevine Station North -Phase 1 Location Grapevine, TX Client Westwood Real Estate Group - A.L. Burfin Remarks Report 4 Revision Trip Charges* 25.00 Tolls/Parking* Mileage* Chargeable Items FIELD REPORT Project No. 63:1045 Report No. 4R Day & Date Thursday 03/21/2019 Weather On -Site Time 0.00 Lab Time 0.00 Travel Time* 0.00 Total 0.00 Re Obs.Time 0.00 Time of Arrival Departure 12:OOP 12:OOP * Travel time and mileage will be billed in accordance with the contract Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. This is a revision of Report 4 (03/15/19). Report 4 did not list the building or lot number associated with the work on site. This report is being issued to update the lot location where work was performed. The undersigned arrived on site, as requested, to observe the compaction of soils for Lot 5, Storm Drain Line 1 from STA 0+00 to 3+73. Please see the attached sketch. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density with a moisture content above optimum, as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. By Kiro Phelopes, — Field Technician 1800 10581 Transmittal Page 2/6 �erSt�(es Vis- I °L1 T 15inI)Or Transmittal Page 3/6 $@til zni ,t,ttil \11, 4�J/ F; -'7N !tr r 84 S ' « Fse4se. a' {iia ➢ 9 f 1 i '4 R, R 9+L9 "ro CLW Transmittal Page 3/6 ATTACHMENTS C Attachment No. 1 Area of Storm Drain Backfill Attachment No. 2 Area of Storm Drain Backfill Transmittal Page 4/6 Field Compaction for 1045 Report 4 VIEDFR REPORT 4 Field Compaction Summary, ASTM D6938 Project No: 1045 Project Grape%inc Station Nonh-Phase 1 Date: 03/15/19 Name: Client: Westwood Group Dc%clopmcnt No. I I Contractor: None Listed Technician: Kiro Phelopes Test Method Nuclear Transmittal Page 516 Nuclear Gauge No: 35G3 A1ake: Humboldt Density Std: 2710 Model: 5001 -EZ AtoistureStd; 430 Serial No: 3563 Sample Description Proctor Method Uncorrected Max. Uncorrected Opt. Spec. Source No Comments Wet Density (Pci) Densih' MC Gray. P 1 F 1 Standard Proctor Storm Drain Line 1, 0.00 101.90 20.10 D4S-3 Sandy Fat Clay, Brown Method (.ASTM ID 101.90 20.10 2.65 nsite (i -698) Sample No D4S-3 P 2 Test No Lot No Test etude Probe Depth Station / Location Litt ! Eley % Oversize Corrected Maximum Dry Density (Pc0 Corrected Optimum Moisture Content (%1 Test Data Comments Wet Density (Pci) Dry Density (Pct) Moisture Content (e/a) Percent Comp. (°/a) P 1 F 1 DT Storm Drain Line 1, 0.00 101.90 20.10 126.7 99.2 27.7 97.4 STA 3+50 (i SG -4 Sample No D4S-3 P 2 DT Storm Drain Line 1 0.00 101.90 2010. 126.7 99.3 27.6 97.4 STA 2+73 6 SG -4 Sample No D4S-3 P 3 DT Storm Drain Line 1 0.00 101.90 20.10 122.7 98.3 24.9 96.4 STA 2+25 6 SG -4 Sample No D4S-3 P 4 DT Storm Drain 1, 0.00 101.90 20.10 125.7 101.4 24.0 99.5 Line 6 SG -4 Sample No D4S-3 P 5 DT Storm Drain Line 1 0.00 ]01.90 20.10 126.5 100.2 2(i.2 48.3 STA 1+25 6 SG -4 Sample No D4S-3 P 6 DT Storm1, 000 101.90 20.10 125.7 99.4 26.5 97.5 A 1+000 6 SG -4 Sample No D4S-3 P 7 DT to Drain Line 1, 0.00 101.90 20.10 1253 100.1 25.2 98.2 STA 0+ 5 6 SG -4 Sample No D4S-3 P Test Mode: DT = Direct Transmission BS = Back Scatter Transmittal Page 6/6