Loading...
HomeMy WebLinkAboutECS 4/16/2019Change this name 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682)350-2250 [Phone] (817)847-8616[Fax] April 22, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 ATTN: Mr. A.L. Burtin LETTER OF TRANSMITTAL RE: Grapevine Station North -Phase 1 ECS Job # 63:1045 Permits: Location: 801 E. Northwest Hwy Grapevine, TX We are enclosing: X Field Reports X For your use X As requested CC: Westwood Group Development No. 11 - Randy Sawey City of Grapevine - Scott Cannon Les Daigh Excavating and Demolition - Les Daigh Westwood Group Development No. 11 - Taylor City of Grapevine - Donald Dixson Hazlewood Acadia Capital Group - Brad Catlett ENCL: Field Report # 9 04/16/2019 SS -A BF Pig OF TFL 11h ........................... VINCENT JOSEPH ELIZARDE APR 19 2019 Vince Elizarde Principal Engineer Eli Wood Construction Materials Dept. Manager usciaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 4. Incomplete or non -conforming work will be recorded for future resolution. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. 1000.1 Transmittal Page 1/6 (Change this namel 4050C Drive, Suite 500 FortWorthorth,, TX 76137 (882)350-2250 [Phone] (817) 847-8616 [Fax] Project Grapevine Station North -Phase 1 Location Grapevine, TX Client Westwood Real Estate Group - A.L. Burtin Remarks SS -A BF Trip Charges' 45.00 Tolls/Parking' Mileage* Chargeable Items 1 - Nuclear Gauge Rental FIELD REPORT Project No, 63:1045 Report No. 9 Day & Date Tuesday 04/16/2019 Weather 76e/ Cloudy On -Site Time 1.50 Lab Time 0.25 Travel Time* 0.35 Total 2.10 Re Obs.Time 0.00 Time of Arrival Departure 03:30P 05:OOP * Travel time and mileage will be billed in accordance with the contract. Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the compaction of soils for Lot 2R, Sanitary Sewer, Line A, from STA 1+08 to 3+61. Please see the attached sketch. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density with a moisture content above optimum, as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. By Maicheal K Wahba, — Senior Field Technician 1 1800 11223 Transmittal Page 2/6 ty'A5iTicr 10 q 5 014' 16-'9 1jc:k;c'hc ti Transmittal Page 3/6 i r ... v ? 9 l - 34 s o ....... ...... _ 14M[I rT�IK'{SrrViyp Nul�).� urw r�w� O � r All s B • - •)rC1.OSh y o+m )+m x+m prm x+m Transmittal Page 3/6 ATTACHMENTS E Attachment No. 1 Condition of the soil at the time of testing Attachment No. 2 Condition of the soil at the time of testing Transmittal Page 4/6 nrrita� [CHANGE THIS NAME] Field Compaction Summary, ASTM Nuclear Project No: 1045 Project Name: Graoev'ne Station North-Pinme 1 Client: Westwood Group Development No. 11 Contractor: None Listed Technician: Maicheal K Wahba =thodethod ASTM Nuclear 9040Density Std 3263 Moisture Page 1 Date: 04/16/2019 Sample No. Description Proctor Method Uncorrected Max. Densit Uncorrected Opt. MC D48-1 Fat Clay With Sand, Tan ASTM D 698-12 Method A Standard 96AO 23,40 D4S-2 Sandy Fat Clay, Dark Brown ASTM D 699-12 Method A Standard 93.50 24.40 Comcted Comrasa Probe Maximum O'nure Optimumg12.9 Dryr26.1 Percent Test Test Depth Station/ Lift/ % Dn' Densit Comp.No. P/F Comments Lot No. Mode (in.) Location Elav Sample No. Oversize Density Contem (pcf) (%) (PO(�) c1 DT 6 Sanitary Sewer Line A, STA SG -7' D4S-2 0.00 93.50 24.40 89.695.8 P 1+50 2 DT 6 Sanitary Sewer Line A, STA SG -6' D4S-2 0.00 93.50 24.40 115.8 91.8 26.3 982 P 2+50 3 DT 6 Sanitary Sewer Line A, STA SG -5' D4S-2 0.00 93.50 24.40 114.5 90.3 26.8 966 P 3+25 4 OT 6 Sanitary Sewer Line A, STA SG -6' D4S-1 0.00 96.40 23.40 118.1 95.3 24.1 98.9 P +50 5 DT 6 Sanitary Sewer Line A, STA SG -5' D4S-1 0.00 96.40 23.40 117.6 95.1 23.6 96.7 P 2+50 6 DT 6 Sanitary Sewer Line A, STA SG -4' D4S-1 0.00 96.40 23.40 118.2 94.1 25.7 97.6 P 3+25 Sanitary Sewer Line A, STA SG -5' D4S-1 0.00 96.40 23.40 1180 938 258 97.3 P 1+50 JID6 6 Sanitary Sewer Line A, STA SG -4' D4 S-1 0.00 96.40 23.40 117.0 936 251 97.1 P2+50 6 Sanitary Sewer Line A, STA SG -4' D4S-1 1 0.00 1 96.40 23.40 118.0 94.2 25.3 97.7 P Test Mode: D7 = Direct Transmission BS = Back Scatter Transmittal Page 5/6 WO:1374 EE [CHANGE THIS NAME] Field Compaction Summary, ASTM Nuclear Project No: 1045 Project Name: C7aoev ne Stal on North -Phase 1 Client: Westwood Group Development- No.i1 Contractor: None Listed Technician: Maicheal K Wahba Test Method ASTM Nuclear Nuclear Gauge No. 9040 Make Humboldt Density Std 3263 Model 5001 -EZ Moisture Std 350 Ser. No. 9040 Page 2 Date: 04/16/2019 rest Mode: DT = Direct Transmission BS = Back Scatter Transmittal Page 6/6 W0:1374 Probe Coe'ected Corrected Maximum Optimum Test Data We Dry Moisture Percent Test Test Depth Station I 5EIeV / Ups Moismm Density Density Content Comp. p / F Comments No. Lot No. Mode tn.) Location ple No. Oversize Density Conirnt +50 rest Mode: DT = Direct Transmission BS = Back Scatter Transmittal Page 6/6 W0:1374