Loading...
HomeMy WebLinkAboutECS 4/08/2019fChange this namel EC 4050 Sandshell Drive, Suite 500 3 Fort Worth, TX 76137 (682)350-2250 [Phone] (817)847-8616[Fax] I TO: Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 ATTN: Mr. A.L. Burtin JOB NO.: 1045 LOCATION: 801 E. Northwest Hwy, Grapevine, TX Tarrant County We are enclosing: X Attached X For Your Use 2 CONCRETE, GROUT, AND MORTAR TESTS LETTER OF TRANSMITTAL DATE: 04/08/2019 RE: Grapevine Station North -Phase 1 PERMIT #: X Materials Engineering Division Concrete Reports: X As Requested CC: Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson eroftE �a• ............... VINCENT JOS"­! EUV.01i 1054/1 i'.. <. ��lii�S���' 1:_11.=• •. OEM 0 10, ff,%. I By: Vince Elizarde Principal Engineer City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Tim Tarbutton Office Manager Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the sample test specimens obtained on the report date. 3. The primary purpose of this report is to present the laboratory test results for the indicated sample test specimens. For a full compliance evaluation of construction events that the specimens represent, this test report must be used in conjunction with the related field report. 4. Non -conforming test results will be recorded for future resolution. 5. Test results that do not meet the required strength levels at the specified ages are marked 10W TEST RESULTS ". Transmittal Page 1/2 (Chance this namel C 4050 Sandshell Drive, Suite 500 137 Fort Worth, TX (682)350-2250 [Phone] (817)847-8616[Fax] t. Project: Grapevine Station North-Phase 1 Location: 801 E. Northwest Hwy, Grapevine, TX Concrete Cylinders Strength Report Project : 1045 Set Designation: XA Cast Date: 03/11/2019 Acceptance Age: 28 Days Design Strength: 4000 psi Report No.: 2 Owner: Client: Westwood Group Development No. 11 - Clint Arch.: Gen. Contr.: Struc. Eng.: Whitworth Engineering - Russell Whitworth Conc. Contr.: Placement Information Placement Location: Lot 5, Junction Box at Storm Drain Line 1, STA 0+00 Approx. Location Set Represents: Over batch time concrete at Lot 5, Junction Box at Storm Drain Line 1, STA 0+00 Supplier Information (If ReadvMix) Concrete Supplier: Redi-Mix Concrete Truck No: 1578 Ticket No: 25081936 Mix Designation: 10L11504 Mix Strength: 4000 psi Batch Time: 11:41 AM Added Water: - Field Test Data Tested by: Maicheal K. Wahba Air Temperature: 560 F Fresh Unit Weight: - Time Sampled: 01:23 PM Concrete Temperature: 720 F Slump/Slump Flow: Air Content: a IIPIIIJy II, awrnucuw wIeI paver nQ ryl vrZ encePr wdr bainPieb may nave oeen Men nom me oegimmng of me ioao aver a minimum discharge of approximately one cubic yard. Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1964, and unit weight iaw ASTM C138. Cylinders denoted with Cap Type U are tested using unbonded caps iaw ASTM C1231, cylinders denoted with Cap Types are tested using bonded caps iaw ASTM C617, and cylinders denoted with Cap Type N (none) meet the planeness requirements of ASTM C39 and are tested without caps. Break Types are classified as Type 1,2,3,4,5 or 6 iaw C39. Initial Curing Conditions Curing Box Curing Tank Insulated Cooled Ice Heated Other Remarks: Final Review By: Schematic of Break Type Fracture pattern per Fig 2 of C39 ®®®®®Iq❑❑❑ Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Transmittal Page 2/2 EWood Print Date: 04/08/2019 CCBRv251 Test Curing Average Avg. Breaking Rounded Brk Cap Sample # Test Date Age Type Computed P CrossSectional Load Compr. Str. Type Type Date to Lab (F/L) Diameter (in.) Area (in. -sq) (lbs) (psi) 63-1045-2-1 04/08/2019 28 Lab 4.00 12.56 75496 6010 3 U a IIPIIIJy II, awrnucuw wIeI paver nQ ryl vrZ encePr wdr bainPieb may nave oeen Men nom me oegimmng of me ioao aver a minimum discharge of approximately one cubic yard. Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1964, and unit weight iaw ASTM C138. Cylinders denoted with Cap Type U are tested using unbonded caps iaw ASTM C1231, cylinders denoted with Cap Types are tested using bonded caps iaw ASTM C617, and cylinders denoted with Cap Type N (none) meet the planeness requirements of ASTM C39 and are tested without caps. Break Types are classified as Type 1,2,3,4,5 or 6 iaw C39. Initial Curing Conditions Curing Box Curing Tank Insulated Cooled Ice Heated Other Remarks: Final Review By: Schematic of Break Type Fracture pattern per Fig 2 of C39 ®®®®®Iq❑❑❑ Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Transmittal Page 2/2 EWood Print Date: 04/08/2019 CCBRv251 Change this name 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682)350-2250 [Phone] (817) 847-8616 [Fax] March 23, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 ATTN: Mr. A.L. Burtin LETTER OF TRANSMITTAL RE: Grapevine Station North -Phase 1 ECS Job # 63:1045 Pennits: Location: E. Northwest Hwy. and Texan Tri, Grapevine, TX We are enclosing: X Field Reports X For your use X As requested CC: Westwood Group Development No. 11 - Randy Sawey City of Grapevine - Scott Cannon Les Daigh Excavating and Demolition - Les Daigh Westwood Group Development No. 11 - Taylor City of Grapevine - Donald Dixson Hazlewood Acadia Capital Group - Brad Catlett ENOL: Field Report # 3R 03/21/2019 r � O.. ............ i1t 1 5.* I. /Owctt- ct'� MAR 212019 Vince Elizarde Principal Engineer Report 3 Revision Eli Wood Construction Materials Dept. Manager Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 4. Incomplete or non -conforming work will be recorded for future resolution. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. 1000.1 Transmittal Page 1/5 Change this name 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] Project Grapevine Station North -Phase 1 Location Grapevine, TX Client Westwood Real Estate Group - A.L. Burtin Remarks Report 3 Revision Trip Charges* 25.00 Tolls/Parking* Mileage* Chargeable Items FIELD REPORT Project No. 63:1045 Report No. 3R Day & Date Thursday 03/21/2019 Weather On -Site Time 0.00 Lab Time 0.00 Travel Time* 0.00 Total 0.00 Re Obs.Time 0.00 Time of Arrival Departure 12:OOP 12:OOP * Travel time and mileage will be billed in accordance with the contract Summary of Services Performed (field test data, locations, elevations & depths are estimates) 8 Individuals Contacted. This is a revision of Report 3 (03/14/19). Report 3 did not list the building or lot number associated with the work on site. This report is being issued to update the lot location where work was performed. The undersigned arrived on site, as requested, to observe the placement of 4000 psi concrete for Lot 5, Junction Box Top at Storm Drain Line 1, STA 0+00. Please see the attached sketch. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 55-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five and one individual laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. Prior to the placement of concrete, the reinforcing steel was observed and appeared to be placed in compliance with the project drawings and specifications. By Abdul Khabeer Alokozay, — Field Technician 1800 10580 Transmittal Page 2/5 oMy c cSMtvAt \Oqg AMUL� Transmittal Page 3/5 i t1;1� 1 ;fit Transmittal Page 3/5 rT� \ Concrete Summary for 1045 Report 3 CONCRETE SUMMARY REPORT 3 Page 1 of 1 Project: Grapevine Station North -Phase l Project Vo: 1035 Location: E. Northwest Huy and Texan TH. - GrapevineTarrant - Tarnt County - TX - 76051 Da} -/Date: 03/14119 Contractor: None Listed Client: Westwood Croup Development No. 1 1 Supplier: Redi-Mix Concrete Weather/Temp: Sunny 170 Truck Ticket CC Concrete Batch Truck Time BPo lSlumpAir Coneret RaterNo' Sample No. \`o. mins o f° Temp Added ' Truck Cum Time Arrive Finish 1 15881 11681 3.0 1 3 111:40112:45113:081 88 1 3.0-01. Location : Junction Box Tap at Storm Drain Line 1. STA 0+00 Transmittal Page 5/5