HomeMy WebLinkAboutECS 4/08/2019fChange this namel
EC
4050 Sandshell Drive, Suite 500
3 Fort Worth, TX 76137
(682)350-2250 [Phone]
(817)847-8616[Fax]
I
TO: Westwood Real Estate Group
1000 Texan Trail Ste. 200
Grapvine, TX 76051
ATTN: Mr. A.L. Burtin
JOB NO.: 1045
LOCATION: 801 E. Northwest Hwy, Grapevine, TX
Tarrant County
We are enclosing:
X Attached X For Your Use
2
CONCRETE, GROUT, AND MORTAR TESTS
LETTER OF TRANSMITTAL
DATE: 04/08/2019
RE: Grapevine Station North -Phase 1
PERMIT #:
X Materials Engineering Division Concrete Reports: X As Requested
CC: Westwood Group Development No. 11 - Randy Sawey
Les Daigh Excavating and Demolition - Les Daigh
City of Grapevine - Donald Dixson
eroftE
�a• ...............
VINCENT JOS"! EUV.01i
1054/1 i'.. <.
��lii�S���'
1:_11.=• •.
OEM 0 10, ff,%. I
By: Vince Elizarde
Principal Engineer
City of Grapevine - Scott Cannon
Westwood Group Development No. 11 - Taylor Hazlewood
Acadia Capital Group - Brad Catlett
Tim Tarbutton
Office Manager
Disclaimer
1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS.
2. The information in this report relates only to the sample test specimens obtained on the report date.
3. The primary purpose of this report is to present the laboratory test results for the indicated sample test specimens. For a full compliance evaluation
of construction events that the specimens represent, this test report must be used in conjunction with the related field report.
4. Non -conforming test results will be recorded for future resolution.
5. Test results that do not meet the required strength levels at the specified ages are marked 10W TEST RESULTS ".
Transmittal Page 1/2
(Chance this namel
C 4050 Sandshell Drive, Suite 500 137
Fort Worth, TX
(682)350-2250 [Phone]
(817)847-8616[Fax]
t.
Project: Grapevine Station North-Phase 1
Location: 801 E. Northwest Hwy, Grapevine, TX
Concrete Cylinders Strength Report
Project : 1045
Set Designation: XA
Cast Date:
03/11/2019
Acceptance Age:
28 Days
Design Strength:
4000 psi
Report No.:
2
Owner: Client: Westwood Group Development No. 11 - Clint
Arch.: Gen. Contr.:
Struc. Eng.: Whitworth Engineering - Russell Whitworth Conc. Contr.:
Placement Information
Placement Location: Lot 5, Junction Box at Storm Drain Line 1, STA 0+00
Approx. Location Set Represents: Over batch time concrete at Lot 5, Junction Box at Storm Drain Line 1, STA 0+00
Supplier Information (If ReadvMix)
Concrete Supplier: Redi-Mix Concrete Truck No: 1578 Ticket No: 25081936
Mix Designation: 10L11504 Mix Strength: 4000 psi Batch Time: 11:41 AM
Added Water: -
Field Test Data
Tested by: Maicheal K. Wahba
Air Temperature: 560 F
Fresh Unit Weight: -
Time Sampled: 01:23 PM
Concrete Temperature: 720 F
Slump/Slump Flow:
Air Content:
a IIPIIIJy II, awrnucuw wIeI paver nQ ryl vrZ encePr wdr bainPieb may nave oeen Men nom me oegimmng of me ioao aver a minimum discharge of approximately one cubic yard.
Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P),
temperature iaw ASTM C1964, and unit weight iaw ASTM C138. Cylinders denoted with Cap Type U are tested using unbonded caps iaw ASTM C1231, cylinders denoted with Cap
Types are tested using bonded caps iaw ASTM C617, and cylinders denoted with Cap Type N (none) meet the planeness requirements of ASTM C39 and are tested without caps.
Break Types are classified as Type 1,2,3,4,5 or 6 iaw C39.
Initial Curing Conditions
Curing Box Curing Tank Insulated Cooled
Ice Heated Other
Remarks:
Final Review By:
Schematic of Break Type Fracture pattern per Fig 2 of C39
®®®®®Iq❑❑❑
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Transmittal Page 2/2
EWood
Print Date: 04/08/2019
CCBRv251
Test
Curing
Average
Avg.
Breaking
Rounded
Brk
Cap
Sample #
Test Date
Age
Type
Computed
P
CrossSectional
Load
Compr. Str.
Type
Type
Date to Lab
(F/L)
Diameter (in.)
Area (in. -sq)
(lbs)
(psi)
63-1045-2-1
04/08/2019
28
Lab
4.00
12.56
75496
6010
3
U
a IIPIIIJy II, awrnucuw wIeI paver nQ ryl vrZ encePr wdr bainPieb may nave oeen Men nom me oegimmng of me ioao aver a minimum discharge of approximately one cubic yard.
Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P),
temperature iaw ASTM C1964, and unit weight iaw ASTM C138. Cylinders denoted with Cap Type U are tested using unbonded caps iaw ASTM C1231, cylinders denoted with Cap
Types are tested using bonded caps iaw ASTM C617, and cylinders denoted with Cap Type N (none) meet the planeness requirements of ASTM C39 and are tested without caps.
Break Types are classified as Type 1,2,3,4,5 or 6 iaw C39.
Initial Curing Conditions
Curing Box Curing Tank Insulated Cooled
Ice Heated Other
Remarks:
Final Review By:
Schematic of Break Type Fracture pattern per Fig 2 of C39
®®®®®Iq❑❑❑
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
Transmittal Page 2/2
EWood
Print Date: 04/08/2019
CCBRv251
Change this name
4050 Sandshell Drive, Suite 500
Fort Worth, TX 76137
(682)350-2250 [Phone]
(817) 847-8616 [Fax]
March 23, 2019
Westwood Real Estate Group
1000 Texan Trail Ste. 200
Grapvine, TX 76051
ATTN: Mr. A.L. Burtin
LETTER OF TRANSMITTAL
RE: Grapevine Station North -Phase 1
ECS Job # 63:1045
Pennits:
Location: E. Northwest Hwy. and Texan Tri,
Grapevine, TX
We are enclosing: X Field Reports X For your use X As requested
CC: Westwood Group Development No. 11 - Randy Sawey City of Grapevine - Scott Cannon
Les Daigh Excavating and Demolition - Les Daigh Westwood Group Development No. 11 - Taylor
City of Grapevine - Donald Dixson Hazlewood
Acadia Capital Group - Brad Catlett
ENOL:
Field Report # 3R 03/21/2019
r � O..
............ i1t
1 5.*
I. /Owctt- ct'�
MAR 212019
Vince Elizarde
Principal Engineer
Report 3 Revision
Eli Wood
Construction Materials Dept. Manager
Disclaimer
1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS.
2. The information in this report relates only to the activities performed on the report date.
3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed
on this report date.
4. Incomplete or non -conforming work will be recorded for future resolution.
5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents.
1000.1
Transmittal Page 1/5
Change this name
4050 Sandshell Drive, Suite 500
Fort Worth, TX 76137
(682) 350-2250 [Phone]
(817) 847-8616 [Fax]
Project Grapevine Station North -Phase 1
Location Grapevine, TX
Client Westwood Real Estate Group - A.L. Burtin
Remarks Report 3 Revision
Trip Charges* 25.00 Tolls/Parking* Mileage*
Chargeable Items
FIELD REPORT
Project No. 63:1045
Report No. 3R
Day & Date Thursday 03/21/2019
Weather
On -Site Time
0.00
Lab Time
0.00
Travel Time*
0.00
Total
0.00
Re Obs.Time
0.00
Time of Arrival Departure
12:OOP 12:OOP
* Travel time and mileage will be billed in accordance with the contract
Summary of Services Performed (field test data, locations, elevations & depths are estimates) 8 Individuals Contacted.
This is a revision of Report 3 (03/14/19). Report 3 did not list the building or lot number
associated with the work on site. This report is being issued to update the lot location where
work was performed.
The undersigned arrived on site, as requested, to observe the placement of 4000 psi concrete for
Lot 5, Junction Box Top at Storm Drain Line 1, STA 0+00. Please see the attached sketch.
The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %,
batch to placement time of 90 minutes, and concrete temperature range of 55-95 degrees
Fahrenheit.
Concrete observed on this date appeared to be placed in compliance with project specifications
with regard to temperature, slump, air content, and batch to placement time.
One set of five and one individual laboratory cured concrete cylinders were cast for
compressive strength testing in our laboratory.
Prior to the placement of concrete, the reinforcing steel was observed and appeared to be placed
in compliance with the project drawings and specifications.
By Abdul Khabeer Alokozay, — Field Technician 1800
10580
Transmittal Page 2/5
oMy
c
cSMtvAt
\Oqg
AMUL�
Transmittal Page 3/5
i
t1;1�
1
;fit
Transmittal Page 3/5
rT� \
Concrete Summary for 1045 Report 3
CONCRETE SUMMARY REPORT 3
Page 1 of 1
Project:
Grapevine Station North -Phase l
Project Vo:
1035
Location:
E. Northwest Huy and Texan TH. -
GrapevineTarrant - Tarnt County - TX - 76051
Da} -/Date:
03/14119
Contractor:
None Listed
Client:
Westwood Croup Development No. 1 1
Supplier:
Redi-Mix Concrete
Weather/Temp:
Sunny 170
Truck
Ticket
CC
Concrete
Batch Truck Time
BPo
lSlumpAir
Coneret
RaterNo'
Sample
No.
\`o.
mins
o
f°
Temp
Added
'
Truck Cum
Time
Arrive
Finish
1 15881
11681
3.0 1 3 111:40112:45113:081
88
1 3.0-01.
Location : Junction Box Tap at Storm Drain Line 1. STA 0+00
Transmittal Page 5/5