HomeMy WebLinkAboutECS 4/12/2019Change this name
4050 Sandshell Drive, Suite 500
Fort Worth, TX 76137
(682) 350-2250 [Phone]
(817) 847-8616 [Fax]
April 15, 2019
Westwood Real Estate Group
1000 Texan Trail Ste. 200
Grapvine, TX 76051
ATTN: Mr. A.L. Burtin
LETTER OF TRANSMITTAL
RE: Grapevine Station North -Phase 1
ECS Job # 63:1045
Permits:
Location: 801 E. Northwest Hwy
Grapevine, TX
We are enclosing: X Field Reports X For your use X As requested
CC: Westwood Group Development No. 11 - Randy Sawey City of Grapevine - Scott Cannon
Les Daigh Excavating and Demolition - Les Daigh Westwood Group Development No. 11 - Taylor
City of Grapevine - Donald Dixson Hazlewood
Acadia Capital Group - Brad Catlett
ENOL:
Field Report # 8 04/12/2019 Lot 2R SS A B BF
APR 15 2019
Vince Elizarde
Principal Engineer
Eli Wood
Construction Materials Dept. Manager
Disclaimer
1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS.
2. The information in this report relates only to the activities performed on the report date.
3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed
on this report date.
4. Incomplete or non -conforming work will be recorded for future resolution.
5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents.
1000.1
Transmittal Page 1/8
Project
Location
Client
Remarks
Trip Charges*
Change this name
4050 Sandshell Drive, Suite 500
Fort Worth, TX 76137
(682)350-2250 [Phone]
(817) 847-8616 [Fax]
Grapevine Station North -Phase 1
Grapevine, TX
Westwood Real Estate Group - A.L. Burtin
Lot 2R SS A B BF
45.00 Tolls/Parking* Mileage*
Chargeable Items 1 -Nuclear Gauge Rental
FIELD REPORT
Project No.
63:1045
Report No.
8
Day & Date
Friday 04/12/2019
Weather
710/ Sunny
On -Site Time
3.50
Lab Time
0.25
Travel Time*
1.50
Total
5.25
Re Obs.Time
0.00
Times of Arrival Departure
08:OOA 10:00A
02:30P 04:OOP
* Travel time and mileage will be billed in accordance with the contract
Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. I
The undersigned arrived on site, as requested, to observe the placement and compaction of soils
for Lot 2R, Sanitary Sewer, Line B, from STA 0+00 to 0+79, and Sanitary Sewer, Line C, from
STA 0+00 to 1+25. Please see the attached sketches.
Utilizing the nuclear test method to check the compaction of soils; test results indicated that the
compacted material, at the areas and elevations tested, met or exceeded the project
requirements of 95% of the maximum dry density with a moisture content above optimum, as
obtained in our laboratory using the Standard Proctor Method (ASTM D-698).
Locations and elevations of all tests are based on stakeout provided by others. We cannot be
responsible for structures located off of the observed engineered pad, misaligned utilities or
stakeout errors causing uncontrolled fill to be placed in structural areas.
By Ashok Babu Neela, — Senior Field Technician I 1800
11163
Transmittal Page 2/8
042, 6APAVEV114E SrOMW bENarrlEs
A-c.ut r
lta
Transmittal Page 3/6
1 in
--__-- - ----
-_ --
-- -
_____ l __
'Lf
1�
w
k
oii
1q
,}e
lta
Transmittal Page 3/6
04112- GRApP4W9 STATION DENSmES
ASHok
Transmittal Page 4/8
D
Rs
'fit K
.&
i
e.
wnC'.mC
o+m yam
a.m 3•m um
Transmittal Page 4/8
ATTACHMENTS
Attachment No. 1
Compacting the soil
Attachment No. 2
Condition of the soil at the time of testing
Transmittal Page 5/8
mE
[CHANGE THIS NAME]
Field Compaction Summary, ASTM Nuclear
Project No: 1045 Project Name: Grapevine Station North -Ph e 1
Client: Westwood Group Development
No. 11
Contractor: None Listed
Technician: Ashok Babu Neale
Test Method ASTM Nuclear
Nuclear Gauge No.9069
Make Humboldt Density Std 3195
Model 5001 -EZ Moisture Std 327
Ser. No. 9069
Page 1
Date: 04/12/2019
Sample No.
Description
Proctor Method Uncorrected Max. Dn,,t
Uncorrected Opt. MC
Di
Fat Gay With Sand, Tan
ASTM D 69&72 Methotl A Standard 95,41)
23.40
D4S-2
Sandy Fat Clay, Dark Brown
ASTM D 698-12 Method A Standard 93.50
24.40
D4S3
Sandy Fat Clay, Brown
ASTM D 698-12 Method A Standard 101.9D
20.10
Coneded
conccmd
Probe
Maximum
Optimum
Wet
e
Percent
Test
Test
Depth
Station /
Lift /
%
Dry
Moisture
Density
Comp.
p / F
Comments
Ne.
Lot No.
Mode
(In.)
Location
Elev
Sample No.
Oversize
Density
Comrnt
(pct)
(%(%)1
TDeusityCoonsttert
DT
8
Sanitary Sewer Line B, STA
SG -8'
D4S-3
000
101.90
20.10
119.4
9s.5
P
0+25
2
DT
8
Sanitary Sewer Line B, STA
SG -7'
D4S-1
0.00
96.40
23.40
117.0
92.6
26.4
96.1
p
0+25
3
DT
8
Sanitary Sewer Line B, STA
SG -6'
D4S-2
0.00
93.50
24.40
113.2
89.8
26.1
96.0
p
0+25
4
DT
8
Sanitary Sewer Line B, STA
SG -5'
D4S-2
0.00
93.50
24.40
115.8
90.7
27.7
9'!.0
P
0+25
5
DT
8
Sanitary Sewer Line B, STA
SG -4'
D4S-1
0.00
96.40
23.40
115.8
91.9
26.0
95.3
p
0+25
6
DT
8
Sanitary Sewer Line B, STA
SG -3'
D4S-3
0.00
101.90
20.10
121.1
98.1
23.4
96.3
P
0+25
7
DT
8
Sanitary Sewer Line B, STA
SG -7'
D4S-1
0.00
96.40
23.40
116.2
92.3
26.1
95.7
P
0+60
8
DT
8
Sanitary Sewer Line B, STA
SG -6'
D4S-3
0.00
101.90
2010.
7208.
97.3
24.2
95s
P
0+60
Test Mode: DT = Direct Transmission BS = Back Scatter
Transmittal Page 6/8
WO:1314
mE
[CHANGE THIS NAME]
Field Compaction Summary, ASTM Nuclear
Project No: 1045 Project Name: Graney ne Station North-Pha e 1
Client: Westwood Group Development
No. 11
Contractor: None Listed
Technician:Ashok Babu Neela
rkSer.No.9069
st Method ASTM Nuclear
Nc.9069
ldt Density Sttl 3195
Z Moisture Sir 327
Page 2
Date: 04/12/2019
Test Mode: DT = Direct Transmission BS = Back Scatter
Transmittal Page 7/8
Corzeded
Conmted
Test Data
Probe
Maximum
Op�imum
We t
Dry
Moisture
¢
Peent
Test
Test
Depth
Station /
Lift /
%
D""
mmismre
Density
Density
Content
Comp.
P / F
Comments
No,
Lot No.
Moda
(in.)
Location
Elea,
Sample No.
Oversize
Devsiry
Comevt
(pct)
(pi
(pi
9
DT
8
Sanitary Sewer Line B, STA
SG -5'
D4S-1
0.00
96.40
23.40
117.8
94.4
24.8
0+60
1
10
DT
8
Sanitary Sewer Line B, STA
SG -4'
I Di
0.00
96.40
23.40
115.1
93.0
23.8
96.5
p
0+60
11
DT
8
Sanitary Sewer Line B, STA
SG -3'
Dili
0.00
93.50
24.40
114.9
90.1
27.5
96.4
p
0+60
12
DT
8
Sanitary Sewer Line B, STA
SG -2'
Di
0.00
96.40
23.40
118.5
93.8
26.3
97.3
P
0+60
13
DT
8
Sanitary Sewer Line B, STA
SG -1'
D4S-2
0.00
93.50
24.40
114.6
91.7
25.0
98.1
P
0+60
1
14
DT
8
Sanitary Sewer Line B, STA
SG
Di
0.00
101.90
20.10
119.4
96.9
23.2
95.1
p
0+60
1
15
DT
8
Sanitary Sewer Line C, STA
SG -5' I
D4S-2
0.00
93.50
24.40
114.1
88.8
28.5
95.0
P
0+25
1
16
DT
8
Sanitary Sewer Line C, STA
SG -4'
Di
0.00
93.50
24.40
115.8
90.5
28.1
96.8
P
0+25
17
DT
8
Sanitary Sewer Line C, STA
SG -3'
Dili
0.00
93.50
24.40
114.7
89.1
28.7
953
p
0+25
18
DT
8
Sanitary Sewer Line C, STA
SG -2'
Di
0.00
93.50
24.40
117.4
91.3
28.6
97.6
p
0+25
Test Mode: DT = Direct Transmission BS = Back Scatter
Transmittal Page 7/8
E5
[CHANGE THIS NAME]
Field Compaction Summary, ASTM Nuclear
Project No: 1045 Project Name: Grapevine Station North -Phage 1
Client: Westwood Group Development
No. 11
Contractor: None Listed
Technician:Ashok Babu Neela
Test Method ASTM Nuclear
Nuclear Gauge No. 9069
MakeHuboldt Density Std 3195
Model 500m1-EZI Moisture Std 327
Sec No. 9069
Page 3
Date: 04/12/2019
Test Mode: DT = Direct Transmission BS= Back Scatter
Transmittal Page 8/8
WO 1314
Coneded
Cortected
Test Data
Probe
Maximmn
Optimum
wet
Dry
Moisture
Percent
Test
Test
Depth
Station /
Lift/
%
Dry
Moisture
Density
Density
Content
Comp.
p / F
Comments
No.
Lot No.
Motle
(In.)
Location
Elev
Sample No.
Oversize
Devsiry
Comrnt
(pn)
(pct)
(�)
(%i
Pert
%)
19
DT
8
Sanitary Sewer Line C, STA
SG -1'
D4S-2
0.00
93.50
24.40
115.0
89.1
29.2
95.3
p
0+25
20
DT
8
Sanitary Sewer Line C, STA
SG
D4S-2
0.00
93.50
24.40
115.7
91.0
27.1
97.3
P
0+25
21
DT
8
Sanitary Sewer Line C, STA
SG -4'
D4S-1
0.00
96.40
23.40
118.8
93.5
27.0
97.0
P
1+10
22
DT
8
Sanitary Sewer Line C, STA
SG -3'
D4S-2
0.00
93.50
24.40
115.7
89.9
28.7
96.1
P
1+10
23
DT
8
Sanitary Sewer Line C, STA
SG -2'
D4S-2
0.00
93.50
24.40
116.3
90.2
28.9
96.5
P
+10
24
DT
8
Sanitary Sewer Line C, STA
SG -1'
D4S-1
0.00
96.40
23.40
116.8
92.5
26.3
96.0
P
1+10
1
25
DT
8
Sanitary Sewer Line C, STA
SG
D4S-2
0.00
93.50
24.40
115.5
90.8
27.4
97.1
P
1+10
Test Mode: DT = Direct Transmission BS= Back Scatter
Transmittal Page 8/8
WO 1314