HomeMy WebLinkAboutItem 09 - Euless Grapevine / Stone Myers Parkway Construction MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER �� MEETING DATE: JANUARY 19, 2010 SUBJECT: CHANGE ORDER # 3 EULESS GRAPEVINE/STONE-MYERS PARKWAY CONSTRUCTION PROJECT RECOMMENDATION: City Council consider approval of Change Order#3 to the Euless Grapevine/Stone-Myers Parkway Construction Project in an amount of $381,140.29, authorizing staff to execute Change Order# 3, and take any necessary action. FUNDING SOURCE: Funds are available in the following accounts GO Bonds Account# 178-78105-016. This project.is being funded 60.5% with Federal funds and 39.5% with City funds. BACKGROUND INFORMATION: Change Order# 3 addresses the following items: Street Light Foundations and Conduit 50 Street Light Foundations and 12,400 LF of Conduit $ 146,101.70 Hand Rail 160 LF of Hand Rail adjacent sidewalks crossing box culverts $ 11,340.80 Sidewalk with Handicap Ramps 8,100 LF of sidewalks with 17 handicap ramps $ 223,697.79 In the October 6, 2009 Council Meeting, City Council authorized an amendment to the engineering services contract for the design of sidewalks, handicap ramps and street light foundations along the 8,100 foot route of the project. CA DOCU ME—Mmid10 1 1ILOCALS-1\Temp\XPgrpwise\EG Rd SM Pkwy CO#3 Memo.DOC Change Order# 3. includes the construction costs for these elements of the project. The City typically contracts with ONCOR to install the street light poles, wiring and power for street Fights on our City projects. Since this project is funded with City and Federal funds, the street Fights have to be designed and constructed in compliance with Federal and TxDOT standards which are not consistent with ONCOR's standards. Our consultant is currently preparing the construction plans for these street lights to comply with the required standards. An additional change order will follow for the installation of the wire, setting the street light poles and providing power for the street lights in compliance with Federal and TxDOT standards: Staff recommends approval. C`IDOCUME-1\wsid1011\LOCALS-11Temp\XPgrpwise\EG Rd SM Pkwy CO#3 Memo.DOC