Loading...
HomeMy WebLinkAboutItem 01 - Meadowmere Park ITS MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGE MEETING DATE: NOVEMBER 2, 2010 SUBJECT: CONSIDER APPROVAL OF A CONSTRUCTION MANAGER AT RISK FOR THE NEW LOW WATER BOAT RAMP AND OTHER IMPROVEMENTS AT MEADOWMERE PARK RECOMMENDATION: The staff recommends that the City Council consider awarding the Construction Manager at Risk (CMR) contract to Dean Construction for the new low water boat ramp, restroom facility, fishing tournament pavilion and other improvements at Meadowmere Park. The construction services fee is 5% of the total cost of construction estimated at approximately $400,000. The fees for general conditions, including staff, are not to exceed $75,150. Please see Attachment A— General Conditions Cost Breakdown. FUNDING. SOURCE: Funds in the amount of $470,049 are available via grants from the Texas Parks & Wildlife Department (TPWD) and $156,683 is available as the City's match in the Quality of Life Fund. BACKGROUND: The Council. approved a resolution at the September 16, 2008 meeting authorizing and directing staff to participate in the State Boating Access Grant Program with TPWD for the development of a low water boat ramp, restroom facility, fishing tournament pavilion and other improvements at Meadowmere Park. The Texas Parks & Wildlife Commission approved the grant in two phases, one phase at their January 26, 2009 meeting and the other phase at their January 29, 2010 meeting. The Council also approved a professional services contract with MHS Planning & Design at the April 21, 2009 meeting for the design of the improvements at Meadowmere Park. Requests for Proposals were sent to five construction management firms and all five responded with proposals. A selection team made up of five. city staff from various departments and the design consultant interviewed the five construction management firms on Wednesday, October 6th. Each firm was allowed one hour to inform the interview team of their experience with like projects, the Project Team that will be working with the City, how they would phase and do the construction and the estimated time for construction. October 15,2010 (7:59AM) At the end of each interview, the selection team discussed the strengths and weaknesses of the firm. Each selection team member then scored the firm based upon four criteria. The criteria included experience and performance, staffing, ability to produce "hard estimates" at key milestones in a project and the comments made in the interview. At the end of the final interview, the selection team added up the.scores for each construction management firm and five of the six members of the team rated Dean Construction as the top firm. We have used Dean Construction on several projects here in Grapevine and they have performed satisfactorily. Dean also has an extensive positive work history on projects in many of our surrounding cities. The selection team recommends the Council award the Construction Manager at Risk to Dean Construction. DE October 27, 2010(2:38PM) CITY OF GRAPEVINE Meadowmere Park Boat Ramp Improvements General Conditions Cost Breakdown Description Cost %of Time Project Manager $10,000 25 Superintendent $20,000 100 Project Engineer $0 Admin. $3,000 Other Field Office Staff $0 Other Field Office.Staff $0 Field Engineer Labor $7,000 Field Engineering Equipment&Supplies $3,000 Field Project Office $0 Temporary Fire Extinguishers, Safety Equipment& Labor $500 Office Furniture $0 Office Supplies $0 Postage/Fed ExtCourier Services $300 Miscellaneous Document $1,000 Copy Machine and Paper $0 Office Equipment $0 Telephone and Fax Service $600 Janitorial.Services $0 Construction Clean Up $3,000 Miscellaneous Small Tools and Consumables $500 Vehicle Rental $3,000 Vehicle Fuel, Maintenance and Repair $1,500 Vehicle Insurance $700 All Risk Builders Insurance (Owner Provided) General Commercial Liability Insurance $450 All Other Insurance in Addition to CGL Required $2,000 Building Permit Fee N/C Construction, Equipment Freight&Insurance Charges $0 Independent Testing &Inspection By Owner Final Clean Up $2,000 Special Testing Equipment $0 Travel $0 Temporary Sanitary Facilities $750 Barricades, Protection, Runs, Safety Rails $0 A&P Equipment Trailer $0 General Handling & Hoisting, Fuel & Maintenance $0 Dumpsters(excludes Demo, Masonry, Drywall) $3,000 Computers $0 Contractor Bond $11,600 Contractor Insurance $500 Other: .fob Site Utilities $0 Other: Scheduling Other: Securities Other: Ice/Water Other: Project Sign $750 Total: $75,150.00