Loading...
HomeMy WebLinkAboutECS 7/03/2019We are enclosing:Field Reports For your use As requestedXXX July 8, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 801 E. Northwest Hwy Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] ECS Southwest, LLP LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 32 07/03/2019 Lot 2R Pave Pour 2 Eli WoodSiddharth Neekhra Principal Engineer Construction Materials Dept. Manager JUL 5 2019 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/6 ECS Southwest, LLP 63:1045 32 Grapevine Station North-Phase 1 Wednesday 07/03/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 8.80 The undersigned arrived on site, as requested, to observe the placement of 4000 psi concrete for Lot 2R Pavement (Traffic Lanes - Fire Lane) and 3600 psi concrete for Lot 2R Pavement (Parking Areas). Please see the attached sketch. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 55-90 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature and air content. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. Prior to the placement of concrete, the reinforcing steel for pavement was observed and appeared to installed in accordance with the project drawings and specifications. 88°/ Sunny 45.00 7.75 0.25 0.00 03:45A 11:30A Lot 2R Pave Pour 2 Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather Mileage* 0.80Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Ahmed Abuelgasim Abdalla, — Field TechnicianBy 1800 13084 Transmittal Page 2/6 Transmittal Page 3/6 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 07/03/2019 Westwood Group Sunny / 88 None Listed Charley's Concrete Mix Designation:Multiple (see remarks)Mix Strength:Multiple (see remarks)Design Strength:Multiple (see remarks) B to P min. 1 2147 574570 10.0 10.0 03:27 04:07 04:32 *4.00 3.40(P 84.00 0 Mix. Des.: 4142 Mix Str.: 3600 psiDes. Str.: 3600 psi65 2 1320 574572 10.0 20.0 03:43 04:28 04:40 0.0057 3 1526 574573 10.0 30.0 03:59 04:42 05:11 0.00 172 5 2114 574575 10.0 40.0 04:31 05:03 05:38 0.0067 4 2090 574574 10.0 50.0 04:16 05:09 05:26 0.0070 6 2153 574576 10.0 60.0 04:44 05:27 05:53 0.0069 7 1158 574577 10.0 70.0 04:59 05:30 06:11 0.0072 8 1342 574586 10.0 80.0 06:33 07:15 07:33 0.0060 9 1982 574589 10.0 90.0 06:48 07:35 07:51 0.0063 10 2041 442651 10.0 100.0 07:00 07:41 08:07 0.0067 11 2063 442654 10.0 110.0 07:12 07:51 08:18 *4.25 3.60(P 81.00 0 Mix. Des.: 4518 Mix Str.: 4000 psiDes. Str.: 4000 psi66 13 1158 574598 10.0 120.0 07:32 08:14 09:00 0.0088 12 2058 442657 10.0 130.0 07:29 08:20 08:47 0.0078 14 1917 574601 10.0 140.0 07:52 08:30 09:14 0.0082 * Location:By:Ahmed Abuelgasim AbdallaLot 2R Pavement (Traffic Lanes - Fire Lane and Parking Areas). ECS Southwest, LLP WO:2482 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 4/6 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 2 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 07/03/2019 Westwood Group Sunny / 88 None Listed Charley's Concrete Mix Designation:Multiple (see remarks)Mix Strength:Multiple (see remarks)Design Strength:Multiple (see remarks) B to P min. 15 2144 442663 10.0 150.0 08:16 09:05 09:31 0.0075 16 4 574607 10.0 160.0 08:23 09:08 09:50 0.00 187 17 2041 442670 10.0 170.0 09:39 10:16 10:32 0.0053 18 2147 574616 5.0 175.0 09:39 10:30 10:49 0.0070 * Location:By:Ahmed Abuelgasim AbdallaLot 2R Pavement (Traffic Lanes - Fire Lane and Parking Areas). ECS Southwest, LLP WO:2482 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 5/6 Transmittal Page 6/6