HomeMy WebLinkAboutECS 7/27/2019We are enclosing:Field Reports For your use As requestedXXX July 8, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 801 E. Northwest Hwy Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] ECS Southwest, LLP LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 29 06/27/2019 809 Pier Concrete Eli WoodSiddharth Neekhra Principal Engineer Construction Materials Dept. Manager JUL 5 2019 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/5 ECS Southwest, LLP 63:1045 29 Grapevine Station North-Phase 1 Thursday 06/27/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 5.24 The undersigned arrived on site, as requested, to observe the placement of 3000 psi concrete for 60 Drilled Piers at 809 East Northwest Highway Building. Please see the attached sketch. The required test limits were determined to be a slump of 4-6 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature and air content. THE SLUMP AND BATCH TO FINAL PLACEMENT TIME WERE NOT WITHIN THE DESIGN PARAMETERS. One set of five and one individual laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. The superintendent was informed of the high slump and truck exceeding the final batch to placement time. Note: Drilled pier excavation observation was out of ECS' scope. 90°/ Sunny 45.00 3.75 0.33 0.00 01:30P 05:15P 809 Pier Concrete Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather Mileage* 1.16Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Subeer Singh, — InternBy 1800 12864 Transmittal Page 2/5 Transmittal Page 3/5 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 06/27/2019 Westwood Group Sunny / 90 None Listed Charley's Concrete Mix Designation:3760 Mix Strength:3000 psi Design Strength:3000 psi B to P min. 1 704 178999 10.0 10.0 02:02 02:44 03:40 *7.50 1.80(P 92.00 098 2 991 178999 10.0 20.0 02:21 02:55 04:00 *0.00 93.00 099 * Location:By:Subeer SinghDrilled Piers at 809 East Northwest Highway ECS Southwest, LLP WO:2370 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 4/5 Transmittal Page 5/5