HomeMy WebLinkAboutItem 10 - Palace Arts Center HVACMEMOTO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: BRUNO RUMBELOW, CITY MANAGER
MEETING DATE: AUGUST 20, 2019
SUBJECT: APPROVAL FOR THE PURCHASE AND INSTALLATION OF HVAC
SERVICES FOR PALACE ARTS CENTER
RECOMMENDATION: City Council to consider approval for the purchase and installation of
HVAC services for the Palace Arts Center from Texas Airsystems for the
Grapevine Convention and Visitors Bureau.
FUNDING SOURCE: Upon approval of this purchase, funds will be available in Fund 816 for a
total amount not to exceed $162,390.
BACKGROUND: The roof top air handler and duct work installed in 2000 during the
restoration of the Palace Arts Center is no longer serviceable. For several
years the systems have been repaired and now the software controls are
no longer supported. The three cell heat exchanger assembly on the unit
is now defective as well. The roof top exterior duct work for the unit is
damaged and subject to leak.
The proposal from Texas AirSystems under the TIPS Comprehensive
HVAC Solutions and Service provides the following:
*Engineering services for design of new Roof Top Unit (RTU) and
structural and electrical as required for permitting and sizing of new
equipment.
*Crane and rigging services to remove existing RTU including removal of
wiring and conduit and install new RTU and duct.
*Rigging services to modify existing structural steel for new RTU.
*Furnish and install new Aon 30 ton unit to include Wattmaster Controls.
*Furnish and install new supply and return including installation of new
wire
air ducts as required to connect to existing.
*Provide haul off of existing RTU for recycling.
*Energize circuits and provide in house testing and balancing to verify
equipment is working properly.
This purchase will be made in accordance with an existing interlocal
agreement with the Region VIII Education Service Center of Texas (TIPS)
as allowed by Texas Local Government Code, Chapter 271 and Texas
Government Code, Chapter 791
Bids were taken by the cooperative and a contract was awarded to Texas
AirSystems. The Grapevine Convention and Visitors Bureau and
Purchasing staff reviewed the contract for departmental specification
compliance and pricing and determined that the contract would provide
the best product and pricing for meeting the needs of the City.
Staff recommends approval.
PN/LW
QUOTATION
Date: July 22, 2019
To: Grapevine Convention & Visitor's Bureau
Attn: Paula Newman
Project: City of Grapevine — Lancaster Theater
TEXAS,\t3Wk&
AIRSYSTEMS
PRICING SUMMARY
DESCRIPTION M QTY 6 TAGGING AMI TOTAL NETPRIC�j.�
Option 1— Reusin isting Unit Structure $ 1625390.00
*FOB Factory, Full Freight Allowed, Tax Not Included
We are pleased to quote the following through TIPS Comprehensive HVAC Solutions and Service per
contract #18010101. Effective March 22, 2018 — March 22, 2020
Option 1 Scope of work— Reusing existing unit structure
• Provide Engineering Services for Design of new RTU and Structural and Electrical as required for permitting and
sizing of new equipment
• Provide Rigging services to remove existing RTU
• Provide rigging services to modify existing structural steel for new RTU
• Provide labor to remove excess return and supply ducts
• Furnish and install new Aaon 30 ton unit
• Unit provided with Wattmaster Controls
• Furnish and install new Supply and return air ducts as required to connect to existing. New ducts to be installed at
least 14" above existing roof to allow for roofing to be performed. The intent is to minimize duct runs by
reconfiguring the new unit. New duct to be run above existing duct. New duct to be double walled and insulated.
• Provide crane services to rig new RTU and Duct into place
• Recover refrigerant removal and disposal per EPA guidelines.
• Provide haul off the existing RTU for recycling.
• Provide temporary dumpster for duct work
• Provide in house testing and balancing
• Furnish Mechanical Permit
• LOTO breaker feeding RTU-5
• Remove wiring and conduit to RTU-5 to allow for removal of the unit
• Provide and replace breaker in the MDP with a 200 amp breaker
• Install new wiring from MDP to new RTU
• Energize circuits and verify everything is working properly
• one Year Service Agreement included at no charge
Exclusions IAssumntions
• Any work not specifically stated above is not included.
• Pricing does not include any safety or site specific training or security measures that may be required by the customer
or others.
• Proposal is based upon city approval including street closures as required. Pricing also assumes that the city will not
require architectural screening. If required, this would be extra
• over time work has been excluded except as needed for rigging
• Sales Tax and bonding is excluded
• Roofing is excluded
TexasAirSystefns. coat 1 Norlern :rss Blvd„ ,�iCe0 1, Fort Worth, T 71 Ian n: 1411 fix: l 1
Page 1 of 2
Painting of any kind, including touch up
Asbestos containing materials testing, or abatement.
-This quotation is subject to change without notice and void after 15 days.
-Add to the prices quoted any sales tax payable on the transaction under any effective Federal or State statute.
-F.O.B. Factory, FFA, per mutually agreed schedule. No material to be returned without written authorization.
-Payment terms: Net 30 Days, Upon Receipt of Satisfactory Credit Information.
-Texas AirSystems equipment will be supplied based upon approved submittal data.
-Retainage is not allowed. Texas AirSystems is a material supplier, and will be supplying the entire purchase order value upon delivery of equipment.
-Payment to Texas AirSystems cannot be conditioned on receipt of payment from the owner by a contractor, construction manager, or customer.
-Texas AirSystems standard warranty, parts only, is for 12 months from start-up date, not to exceed 18 months from ship date.
- Texas AirSystems is responsible and accountable only for the acts and omissions of Texas AirSystems.
-Insurance certificates and bonds can/will be provided upon request.
TEXAS AIRSYSTEMS
J" "; r "/ e_w� �
TexasAirSystems, COM\.
2 1 Nor hern :r ss Blvd„ quite 1, Fart Worth, T 76137 Ian n: l .8 . 4 1 1 fax: 8 l 1
Page 2 of 2
ORDINANCE NO. 2019-049
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS, APPROPRIATING $162,390 IN THE
HERITAGE FOUNDATION FUND FOR THE PURCHASE
AND INSTALLATION OF HVAC SERVICES FOR THE
PALACE THEATER; DECLARING AN EMERGENCY AND
PROVIDING AN EFFECTIVE DATE
WHEREAS, staff is recommending approval a purchase of HVAC services from
Texas Airsystems; and
WHEREAS, upon approval, this ordinance will make the total project funds
available for the HVAC services contract in the amount of $162,390; and
WHEREAS, all constitutional and statutory prerequisites for the approval of this
ordinance have been met, including but not limited to the Open Meetings Act; and
WHEREAS, the City Council deems the adoption of this ordinance is in the best
interests of the health, safety, and welfare of the public.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF GRAPEVINE, TEXAS:
Section 1. That all matters stated herein above are found to be true and correct
and are incorporated herein by reference as if copied in their entirety.
Section 2. That the City Council hereby authorizes $162,390 to be appropriated
in the Heritage Foundation Fund for the purchase of HVAC services.
Section 3. The fact that the present ordinances and regulations of the City of
Grapevine, Texas are inadequate to properly safeguard the health, safety, morals, peace
and general welfare of the public creates an emergency which requires that this ordinance
become effective from and after the date of its passage, and it is accordingly so ordained.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS on this the 20th day of August, 2019.
APPROVED:
William D. Tate
Mayor
ATTEST:
Tara Brooks
City Secretary
APPROVED AS TO FORM:
City Attorney
Ordinance No. 2019-049