HomeMy WebLinkAboutECS - 3/21/2019 (2)We are enclosing:Field Reports For your use As requestedXXX
March 25, 2019
Westwood Real Estate Group
1000 Texan Trail Ste. 200
Grapvine, TX 76051
Mr. A.L. Burtin
Grapevine Station North-Phase 1
Location:
Permits:
63:1045
E. Northwest Hwy. and Texan Trl.
Grapevine, TX
RE:
ECS Job #
ATTN:
4050 Sandshell Drive, Suite 500
Fort Worth, TX 76137
(682) 350-2250 [Phone]
(817) 847-8616 [Fax]
[Change this name]
LETTER OF TRANSMITTAL
CC:Westwood Group Development No. 11 - Randy Sawey
Les Daigh Excavating and Demolition - Les Daigh
City of Grapevine - Donald Dixson
ENCL:
City of Grapevine - Scott Cannon
Westwood Group Development No. 11 - Taylor
Hazlewood
Acadia Capital Group - Brad Catlett
Field Report # 5 03/21/2019 SD Line 1 Comp
Eli WoodVince Elizarde
Principal Engineer Construction Materials Dept. Manager
MAR 25 2019
1000.1
Disclaimer
1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS.
2. The information in this report relates only to the activities performed on the report date.
4. Incomplete or non-conforming work will be recorded for future resolution.
3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed
on this report date.
5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents.
Transmittal Page 1/5
[Change this name]
63:1045
5
Grapevine Station North-Phase 1 Thursday 03/21/2019
Project No.
Report No.
Day & DateProject
4050 Sandshell Drive, Suite 500
Fort Worth, TX 76137
(682) 350-2250 [Phone]
(817) 847-8616 [Fax]
FIELD REPORT
3.03
The undersigned arrived on site, as requested, to observe the compaction of soils for Lot 5,
Storm Drain Line 1 from STA 0+00 to 3+73. Please see the attached sketch.
Utilizing the nuclear test method to check the compaction of soils; test results indicated that the
compacted material, at the areas and elevations tested, met or exceeded the project
requirements of 95% of the maximum dry density with a moisture content above optimum, as
obtained in our laboratory using the Standard Proctor Method (ASTM D-698).
Locations and elevations of all tests are based on stakeout provided by others. We cannot be
responsible for structures located off of the observed engineered pad, misaligned utilities or
stakeout errors causing uncontrolled fill to be placed in structural areas.
71°/ Sunny
25.00
2.00
0.25
0.00
04:30P 06:30P
SD Line 1 Comp
Location
On-Site Time
Lab Time
Client
Grapevine, TX
Arrival Departure
Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted.
Westwood Real Estate Group - A.L. Burtin
Trip Charges*
Remarks
Chargeable Items
Weather
1 - Nuclear Gauge Rental
Mileage*
0.78Travel Time*
Total
Time of
Re Obs.Time
* Travel time and mileage will be billed in accordance with the contract.
Tolls/Parking*
Maicheal K Wahba, — Senior Field Technician IBy 1800
10590
Transmittal Page 2/5
Transmittal Page 3/5
Transmittal Page 4/5
[CHANGE THIS NAME]
Test Method ASTM Nuclear
Project No:
Contractor:
Project Name:Date:
Client:
Page 1
Technician:
Nuclear Gauge No.
Make
Model
Ser. No.
Density Std
Moisture Std
1045 Grapevine Station North-Phase 1 03/21/2019
Westwood Group Development
No. 11
None Listed
Maicheal K W ahba
8944
Humboldt
5001-EZ
8944
3167
348
Field Compaction Summary, ASTM Nuclear
Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No.
D4S-1 Fat Clay with Sand, Tan Standard Proctor Method (ASTM D-698)96.40 23.40
D4S-2 Sandy Fat Clay Dark Brown Standard Proctor Method (ASTM D-698)93.50 24.40
Test
No.
Test
Mode
Station /
Location
Probe
Depth
(in.)
Lift /
Elev
Corrected
Maximum
Dry
Density
(pcf)
Corrected
Optimum
Moisture
Content
(%)
%
Oversize
Wet
Density
(pcf)
Dry
Density
(pcf)
Moisture
Content
(%)
Percent
Comp.
(%)CommentsP / F
Sample No.Lot No.
1 DT 6 Storm Drain Line 1, STA 0+50 SG 0.00 93.50 24.40 118.6 92.5 28.2 98.9 PD4S-2
2 DT 6 Storm Drain Line 1, STA 1+50 SG 0.00 96.40 23.40 119.7 94.1 27.2 97.6 PD4S-1
3 DT 6 Storm Drain Line 1, STA 2+50 SG-1'0.00 96.40 23.40 117.9 92.9 26.9 96.4 PD4S-1
4 DT 6 Storm Drain Line 1, STA 3+25 SG-1'0.00 93.50 24.40 115.2 89.8 28.3 96.0 PD4S-2
Test Mode: DT = Direct Transmission BS = Back Scatter WO:945
Transmittal Page 5/5