Loading...
HomeMy WebLinkAboutECS - 4/17/2019We are enclosing:Field Reports For your use As requestedXXX April 22, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 801 E. Northwest Hwy Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] [Change this name] LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 10 04/17/2019 SS-A BF Eli WoodVince Elizarde Principal Engineer Construction Materials Dept. Manager APR 19 2019 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/5 [Change this name] 63:1045 10 Grapevine Station North-Phase 1 Wednesday 04/17/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 2.25 The undersigned arrived on site, as requested, to observe the compaction of soils for Lot 2R, Sanitary Sewer, Line A, from STA 2+00 to 4+14. Please see the attached sketch. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density with a moisture content above optimum, as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 60°/ Cloudy 45.00 1.25 0.25 0.00 09:15A 10:30A SS-A BF Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather 1 - Nuclear Gauge Rental Mileage* 0.75Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Abdul Khabeer Alokozay, — Field TechnicianBy 1800 11261 Transmittal Page 2/5 Transmittal Page 3/5 Transmittal Page 4/5 [CHANGE THIS NAME] Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 1045 Grapevine Station North-Phase 1 04/17/2019 Westwood Group Development No. 11 None Listed Abdul Khabeer Alokozay 72015 Troxler 3440P 72015 2890 690 Field Compaction Summary, ASTM Nuclear Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-1 Fat Clay With Sand, Tan ASTM D 698-12 Method A Standard 96.40 23.40 D4S-3 Sandy Fat Clay, Brown ASTM D 698-12 Method A Standard 101.90 20.10 Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No.Lot No. 1 DT 6 Sanitary Sewer Line A, STA 3+80 SG-3'0.00 96.40 23.40 118.7 94.6 25.5 98.1 PD4S-1 2 DT 6 Sanitary Sewer Line A, STA 3+00 SG-3'0.00 101.90 20.10 120.7 97.3 24.0 95.5 PD4S-3 3 DT 6 Sanitary Sewer Line A, STA 2+00 SG-3'0.00 101.90 20.10 120.7 97.9 23.4 96.1 PD4S-3 Test Mode: DT = Direct Transmission BS = Back Scatter WO:1395 Transmittal Page 5/5