Loading...
HomeMy WebLinkAboutECS - 4/22/2019We are enclosing:Field Reports For your use As requestedXXX April 23, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 801 E. Northwest Hwy Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] [Change this name] LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 11 04/22/2019 SSA BF SD Inlet Conc Eli WoodVince Elizarde Principal Engineer Construction Materials Dept. Manager APR 23 2019 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/8 [Change this name] 63:1045 11 Grapevine Station North-Phase 1 Monday 04/22/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 4.25 The undersigned arrived on site, as requested, to observe: 1. The compaction of soils for Lot 2R, Sanitary Sewer, Line A, from STA 1+08 to 3+61. Please see the attached sketch. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density with a moisture content above optimum, as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 2. The placement of 4000 psi concrete for Lot 2R Storm Drain Line 5 Y-inlet and Storm Drain Line 4 Curb Inlet. Please see the attached sketch. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 55-90 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in 80°/ Sunny 45.00 2.25 0.50 0.00 01:00P 03:15P SSA BF SD Inlet Conc Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather 1 - Nuclear Gauge Rental Mileage* 1.50Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Kiro Phelopes, — Field TechnicianBy 1800 11364 Transmittal Page 2/8 [Change this name] 63:1045 11 Grapevine Station North-Phase 1 Monday 04/22/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT our laboratory. Prior to the placement of concrete, the reinforcing steel was observed and appeared to be placed in compliance with the project drawings and specifications. Kiro Phelopes, — Field Technician 2Page By 1800 11364 Transmittal Page 3/8 Transmittal Page 4/8 Transmittal Page 5/8 Transmittal Page 6/8 [CHANGE THIS NAME] Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 1045 Grapevine Station North-Phase 1 04/22/2019 Westwood Group Development No. 11 None Listed Kiro Phelopes 3563 Humboldt 5001-EZ 3563 2690 435 Field Compaction Summary, ASTM Nuclear Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-1 Fat Clay With Sand, Tan ASTM D 698-12 Method A Standard 96.40 23.40 Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No.Lot No. 1 DT 6 Sanitary Sewer Line A, STA 1+50 SG-2'0.00 96.40 23.40 114.8 91.8 25.0 95.2 PD4S-1 2 DT 6 Sanitary Sewer Line A, STA 1+50 SG-1'0.00 96.40 23.40 115.9 91.7 26.4 95.1 PD4S-1 3 DT 6 Sanitary Sewer Line A, STA 1+50 SG 0.00 96.40 23.40 117.3 93.6 25.5 97.1 PD4S-1 4 DT 6 Sanitary Sewer Line A, STA 2+75 SG-2'0.00 96.40 23.40 116.3 93.5 24.4 97.0 PD4S-1 5 DT 6 Sanitary Sewer Line A, STA 2+75 SG-1'0.00 96.40 23.40 116.8 92.5 26.3 96.0 PD4S-1 6 DT 6 Sanitary Sewer Line A, STA 2+75 SG 0.00 96.40 23.40 117.0 93.1 25.8 96.6 PD4S-1 Test Mode: DT = Direct Transmission BS = Back Scatter WO:1448 Transmittal Page 7/8 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 04/22/2019 Westwood Group Sunny / 80 None Listed Redi-Mix Concrete Mix Designation:10L11504 Mix Strength:4000 psi Design Strength:4000 psi B to P min. 1 1497 17246813 10.0 10.0 01:41 02:20 03:10 *3.00 3.90(P 75.00 089 * Location:By:Kiro PhelopesLot 2R Storm Drain Line 5 Y-inlet and Storm Drain Line 4 Curb Inlet [Change this name] WO:1448 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 8/8