Loading...
HomeMy WebLinkAboutECS - 5/7/2019LETTER OF TRANSMITTAL TO: ATTN: JOB NO.: DATE: RE: PERMIT #: LOCATION: We are enclosing: Attached Materials Engineering Division Concrete Reports:As RequestedFor Your Use 05/07/2019 Grapevine Station North-Phase 1 801 E. Northwest Hwy, Grapevine, TX 1045 Mr. A.L. Burtin Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 6 CONCRETE, GROUT, AND MORTAR TESTS4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] X X XX Tarrant County ECS Southwest, LLP CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Siddharth Neekhra Principal Engineer Eli W ood Construction Materials Dept. Manager MAY 7 2019By: 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the sample test specimens obtained on the report date. 4. Non-conforming test results will be recorded for future resolution. Disclaimer 3. The primary purpose of this report is to present the laboratory test results for the indicated sample test specimens. For a full compliance evaluation of construction events that the specimens represent, this test report must be used in conjunction with the related field report. 5. Test results that do not meet the required strength levels at the specified ages are marked "LOW TEST RESULTS ". Transmittal Page 1/2 We are enclosing:Field Reports For your use As requestedXXX March 23, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 E. Northwest Hwy. and Texan Trl. Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] [Change this name] LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 1R 03/21/2019 Report 1 Revision Eli WoodVince Elizarde Principal Engineer Construction Materials Dept. Manager MAR 21 2019 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/5 [Change this name] 63:1045 1R Grapevine Station North-Phase 1 Thursday 03/21/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 0.00 This is a revision of Report 1 (03/07/19). Report 1 did not list the building or lot number associated with the work on site. This report is being issued to update the lot location where work was performed. The undersigned arrived on site, as requested, to obtain representative samples from Lot 6 of onsite soil (3) for moisture density relationship (Proctor) testing and classification in our laboratory. The results of the testing will be provided under a separate cover, when completed. 25.00 0.00 0.00 0.00 12:00P 12:00P Report 1 Revision Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather Mileage* 0.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Abdul Khabeer Alokozay, — Field TechnicianBy 1800 10578 Transmittal Page 2/5 Transmittal Page 3/5 Transmittal Page 4/5 Transmittal Page 5/5 Project: Location:Report No.: Cast Date: Grapevine Station North-Phase 1 801 E. Northwest Hwy, Grapevine, TX 6 04/29/2019 1045Project : Concrete Cylinders Strength Report Set Designation:A 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] ECS Southwest, LLP Acceptance Age:28 Days 4000 psiDesign Strength: Owner: Struc. Eng.: Client: Gen. Contr.: Conc. Contr.: Placement Location: Concrete Supplier:Truck No: Mix Designation: Ticket No: Mix Strength:Batch Time: Arch.: Westwood Group Development No. 11 - Clint Whitworth Engineering - Russell W hitworth Lot 2R Storm Drain Line 6 Y-Inlet Top at STA 0+67 Redi-Mix Concrete 1565 25119303 10L11504 4000 psi 01:23 PM -Added W ater: Approx. Location Set Represents: Lot 2R Storm Drain Line 6 Y-Inlet Tops at STA 2+67, STA 1+78, STA 0+67 Placement Information Supplier Information (If ReadyMix) Sample #Test Date Test Age Curing Type (F/L) Breaking Load Rounded Compr. Str. (psi) Brk Type Date to Lab Field Test Data Avg. CrossSectional Area (in.-sq) Cap Type Average Computed Diameter (in.)(lbs) Air Content:Air Temperature:Concrete Temperature: Time Sampled:Slump/Slump Flow:Abdul K. Alokozay 02:20 PM 5.50 in. 5.00% (P) Performed by: 78° F65° F Fresh Unit W eight:- 43705491263-1045-6-1 05/06/2019 7 Lab 4.00 2 U12.56 63-1045-6-2 05/27/2019 28 Lab 63-1045-6-3 05/27/2019 28 Lab 63-1045-6-4 05/27/2019 28 Lab 63-1045-6-5 06/24/2019 56 Lab Sampling in accordance with (iaw) ASTM C172 except that samples may have been taken from the beginning of the load after a minimum discharge of approximately one cubic yard. Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1064, and unit weight iaw ASTM C138. Cylinders denoted with Cap Type U are tested using unbonded caps iaw ASTM C1231, cylinders denoted with Cap Type B are tested using bonded caps iaw ASTM C617, and cylinders denoted with Cap Type N (none) meet the planeness requirements of ASTM C39 and are tested without caps. Break Types are classified as: Type 1,2,3,4,5 or 6 iaw C39. Initial Curing Conditions Curing Box Insulated Heated Cooled Remarks: Final Review By: Ice Other Curing Tank Print Date:05/07/2019 EWood CCBRv265 Transmittal Page 2/2