Loading...
HomeMy WebLinkAboutItem 12 - Water Treatment Plant MEMOTO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER 1 — MEETING DATE: NOVEMBER 19, 2019 SUBJECT: APPROVAL OF AN AMENDMENT TO A CONTRACT FOR ENGINEERING SERVICES RELATED TO THE WATER TREATMENT PLANT AND ADOPT APPROPRIATION ORDINANCE RECOMMENDATION: City Council to consider amendment No. 1 for engineering services related to the Water Treatment Plant raw water line and pump station siting study with Parkhill, Smith & Cooper, Inc. and adopt appropriation ordinance. FUNDING SOURCE: Upon approval, the additional funds not to exceed $23,714.83 will be available in the Utility Enterprise Capital Fund 201. BACKGROUND: On June 20, 2017, the City entered into an engineering contract with Parkhill, Smith and Cooper, Inc. in the amount of$138,954 for engineering services related to determine the best site for a new raw water pump station, routing for new raw water lines to the water treatment plant and routing a new potable waterline to serve the proposed golf course club house project. An exhibit showing the study area is attached. In coordination with the US Army Corps of Engineers (USACE), additional environmental and archaeological issues were identified as needing further study. This additional effort was not in the original scope of the contract. If approved, the total engineering services contract for the siting study will be $173,714.83 which exceeds the authorized appropriation of $150,000. As such, this action also includes an additional $23,714.83 in appropriation from the Utility Enterprise Capital Fund. Staff recommends approval. ORDINANCE NO. 2019-076 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, AUTHORIZING THE APPROPRIATION OF $23,714.83 IN THE UTILITY ENTERPRISE CAPITAL FUND; DECLARING AN EMERGENCY AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City Council of the City of Grapevine desires to install a new raw water line and pump station to the Water Treatment Plant; and WHEREAS, funding for the raw water and pump station siting study in advance of the design phase services of was appropriated on June 20, 2017 in the amount of $150,000 from the Utility Enterprise Capital Fund; and WHEREAS, additional funding for the siting study in the amount of $23,714.83 is needed to complete the study; and WHEREAS, funding for the siting study for the raw water line and pump station is available in the Utility Enterprise Capital Fund; and WHEREAS, all constitutional and statutory prerequisites for the approval of this ordinance have been met, including but not limited to the Open Meetings Act and Chapter 211 of the Local Government Code; and WHEREAS, the City Council deems the adoption of this ordinance to be in the best interests of the health, safety, and welfare of the public. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1 . That all matters stated hereinabove are found to be true and correct and are incorporated herein by reference as if copied in their entirety. Section 2. That the City Council hereby authorizes $23,714.83 be appropriated from the Utility Enterprise Capital Fund for the siting study for the raw water line and pump station. Section 3. That the terms and provisions of this ordinance shall be deemed to be severable, and that if the validity of any section, subsection, word, sentence or phrase shall be held to be invalid, it shall not affect the remaining part of this ordinance. Section 4. That the fact that the present ordinances and regulations of the City of Grapevine, Texas, are inadequate to properly safeguard the health, safety, morals, peace and general welfare of the inhabitants of the City of Grapevine, Texas, creates an emergency for the immediate preservation of the public business, property, health, safety and general welfare of the public which requires that this ordinance shall become effective from and after the date of its final passage, and it is accordingly so ordained. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 19th day of November, 2019. APPROVED: William D. Tate Mayor ATTEST: Tara Brooks City Secretary APPROVED AS TO FORM: City Attorney Ordinance No. 2019-076 2 I I III • • 'If 1. , Proposed RWPS Site 2 Proposed RWPS Site 1 to � y 4 14S0 M f I t y Vo*-.. lip r i T Grapevine WTP .� "'. r •'•��• ��'` J'� 1 y _ .a.4�.A•y f ' , 1 inch=600 feet , • LEGEND: - Pump Station --- Trench less Section Trenchless Length Open Cut Length Total Pipeline - Alternative 1 Raw Water Length Alternative 1 1,190FT 4,530FT Len E Alternative 2 Raw Water / 500 Ft Buffer Alternative 2,860FT 690FT 4370FT / r'#► - � _ ,'� Enviro.Sensitive Area = J i apt ry F-7 Culturally Sensitive Area PARKHILLSMITH&COOPER CITY OF GRAPEVINE,TEXAS { EXHIBIT B RAW WATER IMPROVEMENTS STUDY RAW WATER PIPELINE ROUTE ALTERNATIVES Issue: PER Date: AUG 2019 Project No: 01.6995.17 Sheet: APPENDIX ;r Stag Segment Cr;•. << t �ti i Ilk I * Maintenance�Building w • •• r ti 'a s Parking Lot '� •rt �� • 4� s ' �F + 'iw a � Stag Segment A ' / � h `LL e 1 inch=600 feet 1 Alternative 1 - - .. ��} LEGEND: Segment Trenchless Length Open Cut Length Total Pipeline •,;'�L s/ --- Trenchless Section Len F ` �'+ Alternative 1 Segment B ,020750 T 2,540FT 3,560FT 7 Alternative 1 Segment B ' 8 1,020 FT 2,540 FT 3,560 FT ~ 9 C 660 FT 3,820 FT 4.480 FT - Alternative 1 Segment Alternative 2 Alternative 2 Segment A To Pipeline Alternative 2 Segment B Segment Trenchless Length Open Cut Length Length Alternative 2 Segment C A 740 FT 1,450 FT 2,190 FT .. 500 Ft Buffer B 1,200 FT 2,430 FT 3,630 FT C 650 FT 4,340 FT 4,990 FT AA Enviro.Sensitive Area • 0 Culturally Sensitive Area PARKHILL SMITH& COOPER CITY OF GRAPEVINE,TEXAS EXHIBIT D RAW WATER IMPROVEMENTS STUDY POTABLE WATER LINE ALTERNATIVES Issue: PER Date: AUG 2019 Project No: 01.6995.17 Sheet: APPENDIX A