GENERAL REPORT
Project
Trencor Jetco Expansion - Grapevine, Texas
Number sample Date Report Date
D4513A-28832 11-21-94 11-29-94
To
Trencor Jetco Inc.
Report of
Observation of in-place steel reinforcement
Identification
Floor slab
Method of Test
Visual and Applicable Project Specifications
Results
On the above sample date, George Beall representing Rone
Engineers, Inc, arrived on site at 3 : 00 p.m. to observe the
in-place reinforcing steel for the floor slab, 7 thru 13 - A
thru E and 5 thru 7 - A thru C.
No discrepancies were observed pertaining to size, placement
and spacing on this days observation. /
Trencor Jetco, Inc. /John Gilbert V.P. (1) , Schwaob & Sage/Dan
Sage (2) , City of Grapevine/Curtis Bergthold (1)
Rone Englnaars
Rene Engineers RoneEngineers
Geotechnical Consultants
Materials Testing
GENERAL REPORT
Project
Trencor Jetco Expansion - Grapevine, Texas
Number Sample Date Report Date
D4513A-28843 11-22-94 11-29-94
To
Trencor Jetco, Inc.
Report of
Observation of in-place steel reinforcement
Identification
Floor Slab
Method of Test
Visual and Applicable Project Specifications
Results
On the above sample date, George Beall representing Rone
Engineers, Inc. arrived on site at the project to observe the in-
place reinforcing steel for the floor slab, 1 thru 7 - A thru E
and 1 thru 5 - A thru C.
No discrepancies were observed pertaining to size, placement and
spacing on this days observation.
Trencor Jetco, Inc. /John Gilbert V.P. (1) , Schwaob & Sage/Dan Sage
(2) , City of Grapevine/Curtis Bergthold (1) r/
Rone Engineers