HomeMy WebLinkAboutItem 11 - Cotton Belt Trail Section 1MEMOTO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: FEBRUARY 18, 2020 SUBJECT: APPROVAL OF DESIGN CONTRACT FOR COTTON BELT SECTION 1 RECOMMENDATION: City Council to consider approval of a contract for design of Cotton Belt Trail Section 1 to Huitt-Zollars, Inc. in an amount not to exceed $172,794. FUNDING SOURCE: Funding is available in the Quality of Life Fund 121 for an amount not to exceed $340,000. BACKGROUND: On December 17, 2019, the North Central Texas Council of Governments (NCTCOG) issued a call for projects for the Transportation Alternatives Set -Aside Program. Projects eligible for this program include on and off road pedestrian and bicycle facilities. A local match of at least 20% is required for all project submittals. Project applications were due to NCTCOG by Friday, March 1, 2019. On February 19, 2019, City Council approved a resolution authorizing the City Manager to submit the Cotton Belt Trail Corridor project and appropriated funds in the amount of $1,020,000. This amount includes $680,000 for the local 20% match and $340,000 for design and construction contingencies above the required local match. The Cotton Belt Trail Project consists of two sections.Cotton Belt Trail Section 1 (CBT1), which is 0.25 miles in length, follows the TEXRail line from Texan Trail east to the future DFW Cotton Belt Through Station.ln this section, Grapevine would be responsible for design, environmental clearance, and construction costs. Cotton Belt Trail Section 2 (CBT2), which is 1.86 miles in length, is along the DART Cotton Belt rail line as shown in the attachment. Grapevine would only be responsible for the construction costs of this section of trail as the design and environmental clearances have been secured by DART. Staff expects that, if awarded, this segment of the project funding would be assigned directly to DART by the NCTCOG and constructed by DART. Huitt-Zollars, Inc. completed the grant application for the City in the amount of $14,930 and has submitted a proposal for engineering design in the amount of $172,794 to include the design, surveying and environmental clearance for Cotton Belt Trail Section 1. The project consists of designing and developing plans, specifications, proposal documents, and estimates for the construction of approximately 0.25 miles of the Cotton Belt Trail as shown in the attachment. The $14,930 for the grant application and the $172,794 for design are within the $340,000 appropriated for design and construction contingencies. Staff recommends approval. f.. y �+11, � F � •may, 4 . _j r r r f J dutlli '.�, n , riC • p n. Uj CBT 2 i: •;` T T 14 ^ .#. U / _ ! Id ".7iJ[r.i. f I, r I — r '�( '1%"OLY: '45 �-- CBT 1 Y 01 IN ti Y Ilk L CL ; 1 4( .. r' ell P is \ N r . i r tg 3; I, All IT U1 - ELT TRAIL 0 400' 800' 1600' SECTION 1 & SECTION 2 RAPE E. TEXAS GRAPHIC SCALE IN FEET City of Grapevine SCAlf_: 1 " — 800' Public Works Department P.O" BOX 76099 PH 817.410-3155