Loading...
HomeMy WebLinkAboutItem 07 - Water Line Improvement ProjectMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER VVN SUBJECT: AWARD OF CONSTRUCTION CONTRACT AND MATERIAL TESTING SERVICES CONTRACT — 2013 WATER LINE IMPROVEMENT PROJECT FROM SHADY BROOK DRIVE TO DOVE LOOP RECOMMENDATION City Council consider: • awarding the construction contract for the 2013 Water Line Improvement Project to Gra -Tex Utilities, Inc. in the amount of $610,259.00, • awarding a Materials Testing Services contract to HVJ Associates, Inc. in the amount of $2,500.00, • authorizing a 5% project contingency in the amount of $30,600.00, • appropriating funds from the 2011 Water Impact Fee Fund Balance, • appropriating funds from the unappropriated balance of the Utility Fund, • authorizing staff to execute said contracts, and take any necessary action. Funds are programmed in the 2011 Water Impact Fee Fund Balance and in the unappropriated Utility Fund Balance. • The City's water distribution master plan includes this proposed 12 -inch water line to convey additional water to the northwest portion of the City where peak demand puts a strain on the existing delivery capabilities. Construction of this 12 -inch line supplements the recently completed Lake Pointe Subdivision 12 -inch waterline improvements also on the City's master plan. Council authorized City cost participation in the 12 -inch water line through Lake Pointe Subdivision in December, 2012. This proposed 12 -inch waterline connects to the 12 -inch line improvements within Lake Pointe and completes the 12 -inch line identified in the Masterplan extending from Shady Brook Drive through Lake Pointe Subdivision to Dove Loop. RAAGENDA\2014102 -18 -14 1ake Pointe offsite water const award.doc Bids were opened on December 19, 2013 with five bids received as follows: Gra -Tex Utilities, Inc. $ 610.259.00 Flow -Line Construction $ 679,920.00 Canary Construction $ 681,014.00 Saber Development $ 744,148.30 Housley Communications $ 1,147,258.55 Goodwin and Marshall Inc. has reviewed the bids and has recommended that the City award the contract to Gra -Tex Utilities, Inc. The contract schedule for the project establishes a construction time of 240 calendar days. HVJ Associates, Inc. specializes in material placement inspection and testing services to support the City inspection staff for installation of the waterline. HVJ will provide services including field density testing of the compacted backfill soils and concrete testing as needed. HVJ is highly regarded for this type of work and the City of Grapevine has used them in the past with good results. Staff recommends approval. RAAGENDA\2014 \02 -18 -14 \Lake Pointe offsite water const award.doc