HomeMy WebLinkAboutItem 13 - Wireless Connectivity EquipmentMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
.O RUMBELOW, CITY • MANAGER .
MEETING DATE: FEBRUARY 18, 2014
SUBJECT: APPROVAL OF A RESOLUTION FOR THE EMERGENCY
REPAIR OF COMMUNICATION EQUIPMENT
City Council consider adopting a resolution authorizing and ratifying the emergency
purchase of wireless connectivity equipment to repair the communication system at the
Dove Tower that was made from DoubleRadius, Inc.
FUNDING SOURCE:
Funding for this purchase is currently available in account 200 - 43370 -534 -0 (Utility
Fund/ PCMF) in the amount not to exceed $43,626.34.
BACKGROUND:
Dove Elevated Tower serves as a communication platform for several remote City sites
throughout the northern part of the City. This platform consists of two "point to point"
links and several access point antennas to provide communications for these remote
sites.
This communication platform was damaged by the Dove Tank Rehabilitation Project
contractor during installation of hatches to the tower. The damage shorted out all radios
and antennas on the tower serving City sites in the northern part of the City. Sites
impacted included 14 wastewater lift stations, six traffic signals, Fire Station #2, and the
Water Treatment Plant.
Communications with these sites provide us the ability to perform many daily functions
remotely, respond to monitor alarms and event notifications and perform many other
operational functions for nearly 20 remote sites.
This tower platform also serves as the primary communication link for Fire Station #2
and the Water Treatment Plant as well as the point to point link from Dove Tower to
Peach Tower. This point to point link enables all of these remote sites to gain access to
the City owned fiber network.
2:25:11 PM 2/12/2014
DoubleRadius is a vendor who handles this type of communication equipment regularly
and has previously provided this type of equipment to the city. DoubleRadius also had
all the equipment necessary to make the necessary repairs available for immediate
delivery.
The damage occurred late on Friday, January 17 and repairs were unsuccessful that
afternoon. An emergency purchase order was issued to DoubleRadius, Inc. for the new
equipment on Monday, January 20, the system was operational on Wednesday,
January 22 and completed on the January 23.
Contractor has agreed to reimburse the City for these costs.
Attached is a map that shows the remote sites affected by the communication damage.
Staff recommends approval.
KC /BS
2:25:11 PM 2/12/2014
RESOLUTION NO. e0M M q AUiCKT1 -Dd
645�u r P/)1 EIJ-F
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS, AUTHORIZING THE CITY MANAGER
OR THE CITY MANAGER'S DESIGNEE TO APPROVE AND
RATIFY THE EMERGENCY REPAIR OF COMMUNICATION
EQUIPMENT THAT WAS MADE IN JANUARY, 2014 AND
PROVIDING AN EFFECTIVE DATE
WHEREAS, the City of Grapevine, Texas is a local government in the State of
Texas and as such is empowered by the Texas Local Government Code, Section 252.022
(a) (3) for an emergency repair of communication equipment; and
WHEREAS, the emergency repair caused by contractor error was necessary to fix
the City's communication infrastructure.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS:
Section 1. That all matters stated in the above preamble are true and correct and
are incorporated herein as if copied in their entirety.
Section 2. That the City Council of the City of Grapevine ratifies the emergency
purchase of wireless connectivity equipment from DoubleRadius, Inc. on January 20, 2014
in the amount not to exceed $43,626.34.
Section 3. That the City Manager or his designee is authorized to take all steps
necessary to consummate the emergency purchase of said equipment.
Section 4. That this resolution shall take effect from and after the date of its
passage.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS on this the 18th day of February, 2014.
r_I %Ia
ATTEST:
City of Grapevine - Communication Directionals to Dove Water Tower
Enter._ rj it
'IR
11Eadowmere
kledge
Sowpr
rk
Field Wadlo
W
-'W Lakeview Lift Station
or
Lakeview Army Corp Lift Station
Grapevine
Golf Course CL
L in e ni,
GrapevinefAills Pkwy
(2499) & ffrapevine
Labrador
Lift Station
Mills Qjvd N
Foxfire Lift Station
Dr
Kimball Lift Station
=
Kim 111-Rd
Oak
�� Grapevine Mi
Pkwy (2499) & Stalls rs
& Stripes Way
121
P
ckering
Grapevine Mills
Trl & Grapevine
Park
Lagoon Mills Pkwy
Radio
PmehUrs\
Hood Lan4ift Station
Waterplant Lift Stati
n
Gft teiu Anderson Gibson
& Grapevine
>
J U
reatment Mills Blvd S
ove &
Dove
Plant
live , st WaterTower
Dove2 Lift Station Vineyards2 (Campstor—e) -:Vineyardsl (Front Gate)
.E
ineyards3 Lift Station (Murrell Rd) LIN i Dooley
from Denton Creek LS
Fire
Elementary
and traffic signal @
z Station #2
Radio
Do
Pedestrian
Siren
Silverlake - tation
GV Mills Blvd N & Hwy121 NB SIR
Flasher
Grapevine
Communications Network
M Lift Station N
0 = Peach St"WaterTower
Radio +
z
Traffic Light
Northwest
w
hl�fth&
Water Treatment Plant
H & Park
H F
W-Northwest-HWY—T---------j
E-Northwest•Hwy
Water Tower
VV Wail St
G rap evi it Q
"o To Dove Water Tower
in
To Peach St Water tower
"0 Connectors to Dove Tower
8.3ilor
F egl tvled
r-Grapevine
j 1/20/2014