HomeMy WebLinkAboutSFRA2018-1701 r
MAY 3 2018
(11 R `; L, DATE OF ISSUANC
222018
rrt t.= x T s I►I N S O PERMIT#: ' 7 V
BUILDING PERMIT APPLICATION
(PLEASE PRINT LEGIBLY— PLETE ENTIRE FORM)
JOB ADDRESS: SUITE#
LOT: BLOCK: SUBDIVISION:
BUILDING CONTRACTOR(company name): Q"�-b OA6 C'ajaiaL C}rUj o
CURRENT MAILING ADDRESS: 7A 7
CITY/STATE/ZIP: PH:# Z i�t-H Q �SJ� Fax#
PROPERTY OWNER: ► �� �1
CURRENT MAILING ADDRESS:
CITY/STATE/ZIP: rqi�'yl»t. T)c PHONE NUMBER: Z0-I-4 qq-b 3q1
PROJECT VALUE: $ Ll FIRE SPRINKLERED? YES NO
WHAT TRADES WILL BE NEEDED? (Check ones that apply)ELECTRIC PLUMBING MECHANICAL
DESCRIPTION OF WORK TO BE DONE: (q •�Q r
USE OF BUILDING OR STRUCTURE:
NAME OF BUSINESS:
Total Square Footage under roof: Square Footage of alteration/addition:
❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department(required for new buildings,
alterations and additions)
❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: (Not required for 1&2 family dwellings)
❑ 1 hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQUIRED FOR DEMOLITIONS,ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S).
PRINT NAME: SIGNATURE
PHONE#: EMAIL:
® CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Type: V Permit Valuation: $ 4 Z$Ib -00 Setbacks Approval to Issue
Occupancy Group: Fire Sprinkler: YES " NO— Front: Electrical --
Division: Building Depth: Left: Plumbing
Zoning: Q•7 •s" Building Width: Rear: Mechanical
Occupancy Load: Right:
Plan Review A proval: Date: _,C- p•1 Building Permit Fee:
Site Plan Approval: Date: Plan Review Fee:
Fire De artment: Date: Lot Drainage Fee:
Public Works Department: Date: Sewer Availability Rate:
Health Department: Date: Water Availability Rate:
Approved for Permit: Date: S•10.1 t Total Fees: q
Lot Drainage Submitted: Approved: Total Amount Due: '7
P.O.BOX 95104,GRAPEVINE,TX 76099(817)410.3185 OTORMSIOSPERMITAPPLICATIONS 1/02-R-1 V045M,2107,11/09,4l11
BUILDING --- RESIDENTIAL ALTERATION
,GRAMUNrj' Issue Date:June 22,2018
PROJECT DESCRIPTION:Replace(6)Windows
a. PROJECT# (817)410-3010 WWW.mygov.us
SFRA-18-1701 Inspections Permits
City of Grapevine -
LOCATION LEGAL
P.O.Box 95104 1405 Wycliff Ct. Lakewood Acres Addn Blk 1 Lot 39
Grapevine,TX 76099
Grapevine,TX 76051 *01568051*
(817)410-3165 Voice
(817)410-3012 Fax
CONTRACTOR INFORMATION
Red Oaks Contracting *CONSTRUCTION TYPE VB
2729 Albany Drive *OCCUPANCY GROUP R-3
Mckinney,TX 75070 *ZONING DISTRICT R-7.5
(214)499-5399 Phone **APPLICANT NAME Robert Pulido
(214)499-5399 Mobile
**APPLICANT PHONE NUMBER 214-499-5399
APPROVED TO ISSUE ELECTRIC NO
OWNER APPROVED TO ISSUE MECHANICAL NO
Zane Broadhead APPROVED TO ISSUE PLUMBING NO
1405 Wycliff Dr
Grapevine,TX 76051 County Tarrant
Fire Sprinkler System? N/A
AVAILABLE INSPECTIONS Square Footage
► Building Energy Code(required) VALUATION 4250
► Building Final(required)
FEES TOTAL=$99.75
Building Permit Fee $99.75
PAYMENTS TOTAL=$99.75
Red Oaks Contracting(Jr.Pulido)
Other on 0612212018 ($99.75)
Note:CC3314
NOTICES
1)ALL work must be done in compliance with the 2006 INTERNATIONAL
BUILDING CODE.
2)A copy of the signed permit and approved plans must be on site at all times.
3)The project address must be clearly posted at the job site.
READ AND SIGN
I hereby certify that the foregoing is correct to the best of my knowledge and all
work will be performed according to the documents approved by the Building
Department and in compliance with the City of Grapevine Ordinance regulating
construction. It is understood that the issuance of this permit does not grant or
authorize any violation of any code or ordinance of the City of Grapevine. I
FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND
THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR
OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR
FEDERAL AGENCY(S).
MYGOV.US City of Grapevine I BUILDING---RESIDENTIAL ALTERATION I SFRA-18-1701 I Printed 06/22/18 at 10:02 a.m. Page 1 of 3
Signature/ Date
MYGOV.US City of Grapevine I BUILDING---RESIDENTIAL ALTERATION I SFRA-18-1701 I Printed 06/22118 at 10:02 a.m. Page 2 of 3
Y z
t� x
00
oo w Z >
r 3 Se
uui 2 z 3P
w Z ro F= '-Q
LU 0 0 8
LU
cn .
z U- �W a Z � m
�I102
zS 00' — p0
o � m >lm . ZZ
W �g 0o o
m � � �►S
CLw 3 .. . a x t o
C x a =0:
x
L9 h
-� LLJ
j 1� 1,-- Z J
0 Q
X X LU ._i
� x � � ® � � IL
z
J � � �
< W > O � �
oC 0 o
LL 8- �- LL
go
Its m o
� � 4 � IN � eat- OC
cc
1. e �s� a Q ee sa _ J O
w IS: o as _ E J ® * ,�
-hem �"_* � ' S 0Mg
t Q * � d Z
r I .fl QID Qi o o5m a° _j L M * LQ i:) Q
hem e � a QO ® * OYOC
e� = 1- O
a� a.
a. C. i d0 $:�a gg3 V p��$ > x
Egiz
CQ
Cr 00
}� _ "sue ~ « Z Z
p N
G V 1 m ■_
ciog a c�