Loading...
HomeMy WebLinkAboutSFRA2018-1701 r MAY 3 2018 (11 R `; L, DATE OF ISSUANC 222018 rrt t.= x T s I►I N S O PERMIT#: ' 7 V BUILDING PERMIT APPLICATION (PLEASE PRINT LEGIBLY— PLETE ENTIRE FORM) JOB ADDRESS: SUITE# LOT: BLOCK: SUBDIVISION: BUILDING CONTRACTOR(company name): Q"�-b OA6 C'ajaiaL C}rUj o CURRENT MAILING ADDRESS: 7A 7 CITY/STATE/ZIP: PH:# Z i�t-H Q �SJ� Fax# PROPERTY OWNER: ► �� �1 CURRENT MAILING ADDRESS: CITY/STATE/ZIP: rqi�'yl»t. T)c PHONE NUMBER: Z0-I-4 qq-b 3q1 PROJECT VALUE: $ Ll FIRE SPRINKLERED? YES NO WHAT TRADES WILL BE NEEDED? (Check ones that apply)ELECTRIC PLUMBING MECHANICAL DESCRIPTION OF WORK TO BE DONE: (q •�Q r USE OF BUILDING OR STRUCTURE: NAME OF BUSINESS: Total Square Footage under roof: Square Footage of alteration/addition: ❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department(required for new buildings, alterations and additions) ❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: (Not required for 1&2 family dwellings) ❑ 1 hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS,ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINT NAME: SIGNATURE PHONE#: EMAIL: ® CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction Type: V Permit Valuation: $ 4 Z$Ib -00 Setbacks Approval to Issue Occupancy Group: Fire Sprinkler: YES " NO— Front: Electrical -- Division: Building Depth: Left: Plumbing Zoning: Q•7 •s" Building Width: Rear: Mechanical Occupancy Load: Right: Plan Review A proval: Date: _,C- p•1 Building Permit Fee: Site Plan Approval: Date: Plan Review Fee: Fire De artment: Date: Lot Drainage Fee: Public Works Department: Date: Sewer Availability Rate: Health Department: Date: Water Availability Rate: Approved for Permit: Date: S•10.1 t Total Fees: q Lot Drainage Submitted: Approved: Total Amount Due: '7 P.O.BOX 95104,GRAPEVINE,TX 76099(817)410.3185 OTORMSIOSPERMITAPPLICATIONS 1/02-R-1 V045M,2107,11/09,4l11 BUILDING --- RESIDENTIAL ALTERATION ,GRAMUNrj' Issue Date:June 22,2018 PROJECT DESCRIPTION:Replace(6)Windows a. PROJECT# (817)410-3010 WWW.mygov.us SFRA-18-1701 Inspections Permits City of Grapevine - LOCATION LEGAL P.O.Box 95104 1405 Wycliff Ct. Lakewood Acres Addn Blk 1 Lot 39 Grapevine,TX 76099 Grapevine,TX 76051 *01568051* (817)410-3165 Voice (817)410-3012 Fax CONTRACTOR INFORMATION Red Oaks Contracting *CONSTRUCTION TYPE VB 2729 Albany Drive *OCCUPANCY GROUP R-3 Mckinney,TX 75070 *ZONING DISTRICT R-7.5 (214)499-5399 Phone **APPLICANT NAME Robert Pulido (214)499-5399 Mobile **APPLICANT PHONE NUMBER 214-499-5399 APPROVED TO ISSUE ELECTRIC NO OWNER APPROVED TO ISSUE MECHANICAL NO Zane Broadhead APPROVED TO ISSUE PLUMBING NO 1405 Wycliff Dr Grapevine,TX 76051 County Tarrant Fire Sprinkler System? N/A AVAILABLE INSPECTIONS Square Footage ► Building Energy Code(required) VALUATION 4250 ► Building Final(required) FEES TOTAL=$99.75 Building Permit Fee $99.75 PAYMENTS TOTAL=$99.75 Red Oaks Contracting(Jr.Pulido) Other on 0612212018 ($99.75) Note:CC3314 NOTICES 1)ALL work must be done in compliance with the 2006 INTERNATIONAL BUILDING CODE. 2)A copy of the signed permit and approved plans must be on site at all times. 3)The project address must be clearly posted at the job site. READ AND SIGN I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). MYGOV.US City of Grapevine I BUILDING---RESIDENTIAL ALTERATION I SFRA-18-1701 I Printed 06/22/18 at 10:02 a.m. Page 1 of 3 Signature/ Date MYGOV.US City of Grapevine I BUILDING---RESIDENTIAL ALTERATION I SFRA-18-1701 I Printed 06/22118 at 10:02 a.m. Page 2 of 3 Y z t� x 00 oo w Z > r 3 Se uui 2 z 3P w Z ro F= '-Q LU 0 0 8 LU cn . z U- �W a Z � m �I102 zS 00' — p0 o � m >lm . ZZ W �g 0o o m � � �►S CLw 3 .. . a x t o C x a =0: x L9 h -� LLJ j 1� 1,-- Z J 0 Q X X LU ._i � x � � ® � � IL z J � � � < W > O � � oC 0 o LL 8- �- LL go Its m o � � 4 � IN � eat- OC cc 1. e �s� a Q ee sa _ J O w IS: o as _ E J ® * ,� -hem �"_* � ' S 0Mg t Q * � d Z r I .fl QID Qi o o5m a° _j L M * LQ i:) Q hem e � a QO ® * OYOC e� = 1- O a� a. a. C. i d0 $:�a gg3 V p��$ > x Egiz CQ Cr 00 }� _ "sue ~ « Z Z p N G V 1 m ■_ ciog a c�