Public Safety Building
& Court Study
Brinkley Sargent Architects
Hal Sargent & Gina Irwin
November 15, 2011 GRAPF�.V-�IN[:
�, � .
,
��IMMI[Y S�[6[MT ��
� � c � iiEer :
Goals of Study
o Analyze current departments and determine
future space needs in order to accommodate
future growth.
o Establish condition and constraints of existing
Police & Court site and ways to address
satisfying future space needs on current site or
with the addition/purchase of adjacent lots.
o Develop budget options and associated site
development exhibits for construction on current
site and with adjacent lots.
�tIMMIET S��CEMT
� � CNITECTE
1
� � 11/14/2011
NEEDS ASSESSMENT
METHODOLOGY
Population and other
❑ Gather Facts factors
■ Devetop research forms for staff to complete
■ Review current and future organization charts OrgChartsand
Comparable Data
■ Review current building/site plans
o Conduct Meetings ConductOn-SiteStaff
Meetings
■ Meetings with kev staff from each deqartment
■ Identify department procedures w/future flexibility oePa�t�»e�ta�sPa�e
o Determine Space Needs "ePds
■ Identify staff and work spaces
Total Square Footage
■ Determine appropriate size for support spaces iaur�<,���es��st�avi
■ Establish Total Square Footage needs
o Develop Options and Pricing Deve1ojn1entOptions
and Pudgets
■ With needs established and sites and existing buildings
reviewed, develop options for satisfying needs and
project budget
Needs Assessment
o Departments involved in the study:
■ Police
■ Dispatch Center
■ Detention Facility
■ Municipal Court
■ Fire Administration
■ Emergency Operation Center
■ Information Technology
o Met with staff 17 times and reviewed projected space
needs for Grapevine's build-out.
o Toured through Police Facilities in Euless and Mesquite
o Toured Emergency Operation Centers in Ft. Worth,
D/FW, and Plano
��iM�itr s��atrt
� � CMIiECTt
2
' 11/14/2011
Study Basis
o Study based upon City
resident population at
Build-Out
Gropevine Populetion
Consideration for
,�,� ----------- ------ -___ _ ._
impact of service „�,� ----------.-----_______ __
population ,p.� _ ____ .
■ Daytime Population '°°'�° � �"'
�.� »,�
estimates based on �� 5712Q
projections from �'� �;�
.o.000 _ , f .__.
Economic Development � �,� 65.000
20.000 ._. �6.331 ..___..._ t6331 ._.._.—. ...._..._.
data
0
�,o �„ �, ��
��1 M M l F Y S/11 6 E N T oDeytimePopupem oRes�tlertPopumnon
� � cNitEera
Current Buildings
o Police, Dispatch, EOC, I�,
Detention and Municipal '� �
��t`��` 'r,
Court occupy 25,000 SF. � i� ,_,-,�� � _�,�,► , ,; �' .
■ Built in 1978 � ' � `
� �, , .. ; � �
, . ;��� � •,e r.��
w �.��-..�_ : � �
��
i,�;� ,�a�. �, ..�
��K� -�+�� ��� T� '
� r�� ', �,.� � �•.
E ' '� ., .;i,.s�., -r; •
�: r` ,
.�- �.��� .. r`�. `
�:;,'�.!`: 1 ,:::� ���
:�� ,�'
��IMt1ET S�A6ENi �''�����. �Y ' ���� •"
� � C � IiECTS
3
� 11/14/2011
Current Buildings
o Court � �
� s ,
� --•� - �� '� �-�;
'�"'` � _�-i.-
E,�� ��i �4 ; ., .;.
� � - .
_ ���w� �,ourt Gierh spac� �(a:r �de
e �'�: � i-_� ��
� . , - � � �
Public Wariiny Ior �ourt and Multi ur�ose ioorn-Jur� � � �"���
Clerks;overflow is routinely in P � y � ' "
Room, Teen Court,storage, %
shared hallway and stairs. and files.
�
lIINNIEY S�I6(NT
� RCNITECTS
Functional Deficiencies - Court
o Court public waiting room
o Secure screening area into courtroom
o Witness waiting room
o Public attorney meeting rooms
��IMMI[Y 5�116EMi
� � criicets
4
� 11/14/2011
Current Buildings
_ RECO�
o Police J � �
� � �. ����5 - _._
,� � E,,. �'� +q►�
^�. .,���, `
_ � _ �:� y � '�
....� � � r �r- ��' �
.:f, . y . . ���..
__ Q No handicap accessible
public window
IR+�. .. �..�r-,_ -�'�"_
. _
' -- _._ r�• �.� � +�
�` . _
1 • '
� Patrol Briefing also serves ��, _' �•�..�
�,�� . as equipment/weapons ��,�
storage and distribution.
FilingiArchive boxes in work
�- _ " .
Current Buildings
, � ,,
o Police , � � � • `'
, , • .
� �� � �
� � ._: .
..�;, ; ` _.�,
it � _ � ,
�� ,� �;
_ ��� ��'
� . a�� �A
,.
� � Locker Room—other uses include
Main Evidence Storage Space Patrol Files,and overflow storage area
for SW,4T equipment
��INYIEY L�ICENT
� � erii [ ers
5
' 11/14/2011
Functional Deficiencies - Police
o Lack of segregated circulation
■ Public (general, victim, and suspect)
■ Detainee
■ Staff
o Public/victim interview space at Lobby
o Juvenile segregation
o Handicap access
a Segregated file rooms
��IMMIEY S�A6ENT
� � c � iTEcra
Functional Deficiencies - Police
❑ Investigations
■ Segregated suspect and victim spaces
■ Detainee interview capabilities
■ Detainee/suspect toilets
■ Forensic workroom
■ War Room for major cases
o Property & Evidence
■ Proper segregation of drugs, weapons, money for
accreditation
■ Evidence drop/processing area
■ Secure after-hours drop location
■ Large item storage space
■ Expansion capability
��iMticr s�es�wr
� � lNIiECTE
6
� 11/14/2011
Functional Deficiencies - Police
o Crime Lab
■ Dedicated chemical and powder processing rooms
o Patrol (Operations)
■ Conference space
■ Juvenile Holding
■ K-9 support space
o Exercise Room
o Storage
■ Lack of space to store quantity
■ Decentralized
I�IMNItY 5�116EMT
� � c � � Teera
Functional Deficiencies - Police
o Detention
■ Handicap access
■ Segregated movement
■ Quantity of Holding
■ Intoxilizer
■ Interview space
■ Kitchen/Laundry
■ Storage
■ Staff support spaces
■ Padded Holding
■ Visitation/Arraignment space
■ Public waiting
��IMNIEY S�R6EMT
� � criTccra
7
11/14/2011
Current Buildings
o Fire Admin/EMC occupy
3,100 SF at Central
Station
■ Built in 1991 ��=�- -��- �.
� `�'., �� �: .
� . .� �
.� r � +� ,
.�
_, , �, ., -. _ r,�, .
�, '�� � 1
,�' 4 . " �'��,..
.�,,. y
;
- � -
'�� �=' _ �``(. ,�. �
s� � . �: � ��,.
_.
._ . , .__._ _ __.____. � :
�11NMlFY 5�116[MT � . -
� � CMITfCT2
Current Buildings
�, . ,
a Fire Admin/EOC occupy . , ����'
3,100 SF at Central �>�� 'i` __ � ��'
Station
� t_'
�-� _ �i R ._ � �
r , .�.t . , � .
��� � � �� ' _ � �l�aining Room-� 3 �,er�E � 3s stor ac��
-'�' ' � � �� � �"�� volunteer workroom and EMS Su��l, locat�on
�_��r, �-�i � i,-.� � ����'
,.#,
�-' ��, �� �� ; � 0 ��I�s�"'7� �:
� �
�M �, �� �` � �'
�� ���� . �1�) •� ^' ^ �7►�. _
�
Multipurpose Storage-Contams IT rack, �
general supplies and Support Service � -
Tech equipment and supplies that's
distributed to staff. Fire Marshal s c�, c>office,plan review,
��i w M i c r S�1 6 E M T plans storage space.
� � CNIiECTf
8
� 11/14/2011
Functional Deficiencies - Fire
o Emergency Operations Center
■ Separate Operations Room
■ RACES room
■ Conference room/s
o Storage
■ Lack of space to store quantity
■ Decentralized (at stations)
��IMMIEY Si116[NT
A � C � IiECTi
Staffing Analysis
o Future Organization Structure
■ New staff to meet projected service needs
■ Final analysis of staff additions represents 5.5% (5,050
SF) of the total square footage needs
�lIMMtFY 5�116fMT
� � eriiEers
9
' 11/14/2011
� .� { � �
Review of Space Standards � � � � ,? �:
SK•21
a Space sizes are defined by function. at���»,�,���^���<<„���
�„M�,,r,��..
,�,,q,,.
, ", .. ,�' ' �
„� _ . -
' • �'o, ro z ro s
W$ 1 W$2 � ��ui arr� nrv.n a�u 1ev�n nm i
WOtR SIn11ON p ��� W�.
� It
mpi�SM� u.w.K,,.n WS 3
iS pit.w��CR, ip qlt.+tA 1 n. N[]Yc Slnl�\ . . ._ • • • --
a(1�pl�M � .�
' ' . ]2 VIt�M�lI[ �
w5 4 Po a Po s
WS 5 WS 5.1 �i a�.i ,
M�CKSIAiq� �K�fiA1N)\ W«�SI�IqV '� p .�q YI �(�
Sb qlt�tu�l M qll.Atiu�l
!U qlt �l�t 6s Wl�• !!Wl�.�w�ln_ �v��f p�x i
Established Parking Needs
o Each type of parking area was reviewed to
accommodate the entire facility:
■ Visitors
o Court
❑ General
❑ Training
■ Staff
■ City Vehicles
❑ Take-Home
❑ Shifting
■ Specialty Vehicles/Apparatus
��IYMIfY S�A6ENT
� � CMIT [ CTS
10
11/14/2011
Initial Building Needs
Municipal Court 12,691 SF
Fire Administration/EOC/Training 20,452 SF
Police 47,474 SF
Support Buildings 7,456 SF
Logistics/Evidence/Crime Scene 14,885 SF
Detention 15,561 SF
TOTAL 118,519 SF
�tIMNIEY S�16EMi
� � CNITECTt
Initial Building Needs, continued
. .. . . - .
- . ..
City I.T. Department 5,064 SF
Public Safety Museum 2,440 SF
Expansion of Dispatch(Euless add) 846 SF
Initial Cost Estimate = $44,449,000
�IIMMiEI 5116ENT
� • C � ITECTY
11
11/14/2011
Project Scope Analysis
o Reviewed all departments for reductions
■ Fire
❑ Reduced Media/Conference Room
❑ Downsized Executive conference room and will utilize 2nd
classroom for EOC Executive conference room
❑ Deleted EOC supply room and will utilize space in large A/V
and storage room next to Operations Room
❑ Break Room reduced
❑ 800 SF of future addition in lieu of building the spaces now
■ Court
❑ Reduced courtroom size
❑ Reduced some offices and support spaces
❑ Reduced size of Court Waiting
��IMMIEY 5�116FMT
� � c � iTEera
Project Scope Analysis — continued
■ Training
o Reduced Classroom capacity from 48 to 40 (2 classrooms)
❑ Deleted Police Physical Training Room
■ Police
❑ Reduced Patrol Briefing Room
❑ Deleted 1 interview room at Investigations
❑ Reduced number of showers/toilets/sinks at Female Locker
■ Detention
❑ Deleted Dayrooms
❑ Reduced Holding capacity
❑ Deleted Attorney Visitation—will use Public Visitation Room
❑ Deleted 1 padded cell
❑ Deleted Manager Office
�RIMMIEY 5�116EYT
� � CNITFCTS
12
. 11/14/2011
Project Scope Analysis — continued
o Reduced Parking Structure in conjunction with staff
reductions
o Removed City Budgets from the Total Project Cost
Cuts to this point result in $7.1 million in reductions
o Additional cuts then included:
■ No City IT department at facility
■ No Dispatch expansion
■ No Public Safety Museum
■ Eliminated LEED considerations
Total Cuts result in $10.9 million in reductions
I�INNIEI S�ICFNT
� / CNITEtTt
Resultant Building Needs
. .
..
Municipal Court 10,140 SF
FireAdministration/EOC/Training 13,150 SF
Police 42,088 SF
Support Buildings 6,936 SF
Logistics/Evidence/Crime Scene 13,416 SF
Detention 10,693 SF
TOTAL 94,423 SF
Total Square Footage reduction to base = 24,096 SF
��ir�ttr i��iEYT
� � C � ITECTt
13
. 11/14/2011
SITE ANALYSIS
Option A — Phase 1
_
�� � � _.
� , �„�.� ;
, � �,e p,m«�.u„���x1.,«�.,.,n�,4na ,
� � . , � � ' .�erN��nnr}nd
1
. ' � � �•
i :M�w �
�� i► ± 1'luv[ �LY�IMI I�1C!�l�IIId1SjIWt� �
,a..', .l._a` MAJI�(O�1�(I Yd fRi.l\(Ol k1�1 �
-.-..�.,.f `r _�. PoM[c/(�!/laVi�IW LOynnCS Y�idr�. i
_ �"` �x�t U+nu6A r�nu�{I�J�lnp.
tt�t xrlMr qMg ha Mh►'.
` t XISI WC. Skx�nr,yyu„n„rrk.�.��.1�a�bM
tACll I11' .'..�,_
w �
; \k1V J IlR � "' 7 � �
� � ; i'd IIIIY w/ i IVI � �-
� . s�: P�1kAING IINOW � ` .
�� � ''
�-
i . •
�I ^ �
�' � • �
14
. 11/14/2011
Option A — Phase 2
o,��AS Ko. � ���; ;�.;.� i o�„oN n
, � ,,,�,�,�� .,�....,,.......,
�t � �z •'•• " ':,�.' ..�..�,.
..�,.�d a,,..,w P..
P j•�F ,�
o � «. ... :�.�.::;"��
� � � _ .. ....��.,.a
� n► Y� Y ' 4 .. ...
m
rv�dn�.
MKt/ � ��M�I�.ptt�Y
-�i. � V..�1 .i.���.• v. .. YM�rob
� �'" 1� � 'tW�wJ Y.., n,n�.q .' ; o....<m�v�4�
� ����i.�� 5 , ��+.�..�
Mun w x.a
_ � ! �
in..�ooY�r.a�a Y �
"`'t i�' .._....� t� `
.�'�„��. ., ,,.,�. ,:',;`�%
'�*, .•.;: . . .;� '
AASH ST. .� I
� . r �".!4' ".� .. � , � a•r- .
Option A Development - $ 33,366,000
T�,� j� i ,
� � ����.
�� �-� .. � ' " ��� -
_ .,_..�u.
.,�,.�
y.._:� ....t� :�i:,.. ....,..
� ' ;___ `�:.�;� . "`,-
+II, o.uusRu �Li:�..:::.'.� OPTIONA
�i��.,,�M � ' `,7 � ._._
� ��,.. , • , ,., ..., --
,' 1� .�+r• wt ..
_ .. .�� ��,a �l � ' �_ � � �i s� '-.7..._... •• �� .....,�.-.�....
.W ��
� �.� � .. ..����r. . .... ��
_ .�` '.�o� .. �} .���i�
� .•1:� .�..�
� ILWISI'••� +*.. �
15
� . 11/14/2011
Total Cost of lots Total Cost of lots
across Pine St. across Church St.
(TCAD values) w '"����� (TCAD values)
�1.�.Ol'IG F
_$607,390 ' _$740,000
o,�.�..•
� " ?�� ia. V
� �i � �
_ „ ,,,� _ ' ->
� �` �-,,. � � � I
``"t.oa - .��t N
�c �
�... ` _ ,
— eeoerRn owHto er arv ntarocrv
— worcrTr rnvNco er on*as nor c�vs�u[R[u
Wllll POf[NfAll(OR[X�Ni51pN
O ��NOl!.
Option B — Phase 1
DAILAS RD. }{J� �� � '�� i OPTION B
�n� , '�T�
� � + "' ��" "
-* ���..�,
� _ - � ��F� � '}4��F� ..�,�..,,.w.,..
� • '1k
� : �. � •�� � . ,�
i �:,.-�.....�..�
� , „ _
�
5 j. � ,* �
��
s �m si�uc�u�iur+itr:rv�. ; . ...
r0a57,vr;YOx[ - : -�y c.s
� ylEyfl � � IMfi� � �-�'��� �"r�"�r��,�r.�
tie K..�.. �f� �
i�J. ,�
� . � "3 -'"`_
_� � fi� .
� 'I� NASH 5T. �, ;� �
`_. _._. tt.� i�_l..i_.—_��.�w I -..
16
. 11/14/2011
Option B — Phase 2
Dutns en. � OPTION 8
��. -�
�. .
� � ���s��,_., _ � �a.....,...
�,�:�,<�� �.a...
a��asa'a �►f� � •l�+1{: ��
axne.c � ��'^
iw�.i .
�a�r r,cosi . r . ' .
� ::iwi i. a . �
°C :+ro�a,i v
p 4;� . � T � � _ �. ��..aa..�o
� -.��"� . � � � r ..�.�. uVc i�r�.a.....n.o.«.
rrK�ri���-
I � ximurvc �l
� m s�vur,�u�wr�U:.rc�G
� rai's�Nnsic}nu 3 � � �:rnu ,'.� . „�,�,�,,.,
�-Aa��ad u , ....�
� :inn �i�l � dwo.:.,.�,;r
>u�..
�u�twnca+
I7�' 7 . :xra�r. �, I
S f
� . � ..... .I�lVll
I f� Vp(ID rou1 S� '.
I ��
�
cd�a4e t��un,o.�� �
� �- , `.'� . �
� ���.:. .�",. :t. � ;� :r�,► K�..
Option B — Phase 3
DAllnS RD ....�_ -� , :-� j OP710N B
` �� �t�•��
�,�.��.'e:ti � �11 LI�,� `.. . ,
� �' w..prA.wei.� - .�...
r1L'�.it�: .�
fa �.���,��; `� i� �B L U�� a - �M.,,,..,...�... �...
� : -Ri.0 uini E� _
�� n oe � eo t�
� �,,,, �-
• C11R11Yvnrl 11 / 11 •y m•
y �� �IfVil � U� S� Y �'tV_�___..1 ��' �p
/�] !tl4Y�i�n�l.e };- 7�. _��;�cimalN � � ''�_ � .�a.�.wY�w.ti a.e.F.
� � � I� II� � Y �nlan�rw�w�nwn�.
J � ._.I R%R�,�i¢�, .�i. � � tiwx�.wN�I+Yn•V4�
.._ I I 1(ll N�n I��..i�1Y �� PM
� m SI[tlC�ULtU11RKM: � �..���nr�.I •
(ORS7Af{15[CUY[ �I � iiNlt �� Il (a�
N �w�.��W.w+�
�- — :tiYu `' , i�i M1 F� w. rw
� lr�^ ` c � ��
u[i[ntW� �
� � : �. .._. . c � �L .y� �� � I�n� I �.
¢ _- nnn ' �
I i vru�e�r v
� :. � , n .�..s....,
�; ' —��tUll tWtn ��1�4,1��
0 I C+ ! Il. - '�" " \\�
�' .. =�
� '��,.�a���� � ! .I.
:�- er� ♦ �..rwti I
17
. 11/14/2011
Option B Development - $ 33,492,000
�.,-,,___ - , _ ._ �.
� •'� R - �� –�._
G • "
��• {� ' "�
� � = '.
�' �,�, � }�/. � _ C� Mu.0�u ►.��-� p110N B
� ��� ^/. �r � _'�� � $.-�11:�� Y�^ •
i T •.
�
1 a !"_ '� e i�� �as e e � : ._—^-_
; ' �� r�i r� � : ,.... � oa� � o ouu � si -•--
�.� � n a ■ • s,■
�: , +'�'�-- ..� =�.-
_u�, _ �_ _.... a,�a.e �� _ ��"�` ; 1'Yj�' _• ___c—
, _'� � _ = �_ � '��� 1N� �.
: �,;�,,• _ ,. �Yp:�:"r . ....--
_ . . .-�� . � _.__'_ i „ t P � _�.�S���d �
, '� = _'_� ��' �
- �,::.�. �� � .. _��- �
��., ..._
_ _ Pt ....._
��:��^ f-� ..._. "`�
_ �
Comparison of Options
� ��
A Existing Yes(3 levels No $33,366,000
below)
B Existing +across Yes(2 levels Yes $33,492,000
Pine above)
Conclusion:
1. Option A is$126,000 cheaper, but there is no off-site cost allocation for
parking provided during construction for city staff, public, and construction
parking as well as construction staging.
2. Option A has many compromises to internal flow/relationships compared to
Option B. Option B allows more first floor access points for detention,
logistics, public functions.
3. Option B appears to be the best option for development.
18
. 11/14/2011
Recommended Option — Option B
, ...
o,�,�us Ro. � __.�- �4. OPTiON B
•� .��,t� �
�-':�,�:ti • ,,
� � vw�<..pf�rv�.. � Y k r�..,
iousricsi • . ���.ww
a (v�Hr+ci i m
� .�,u x�.� � Q� �8 L D;i '� �; �.�..aP..�
��. G noe oen ;
• «�� m:
a caRr„�...�� .
d �� �:��F� �� vv , i � n oeu_���__1!:` �,
� • ::aU(IM1It�$�...���id �1 � . I�.v� r.W��+rd�u�b
-1-� � �1. Y� o�w+.n
','� . .._I'�'.. �T" .. V , ukwc.n.w..ww.rwe
J _ r POIICE Illl(I 7WVnl:: j � ,„�'`.
1 I IOC 9VIl(HNG =e �pMo�j ��
� m S1RUCfVIIlU I�iK��G � ; ' L�
FOR 51.1%/SiCVR[ �I�j � �lfVEIS V ���
� I h`.NYI Mld 5f R�v�..un�...w 1r
- :��: Y.i�r.T.�w�m yp�P�i
_ �w�i.; _. ' Iv+
. : G � � �onrwr�m
7 j`y9 euoir:c
� ,�— ci. � sI� � a ._
a � �- � nnn ' "�
.,����.�„
� , " .,,.�, �ke.
m � N.�all rrtn ra�ct
+r
* t u \
� � UI .L� ..0 � �
,,, �
� .�..._ �: � �
N�SH � �, I
i
Budget Assumptioils
o Schedule
■ 1/2012 — Design start
■ 1/2013 — Construction bid
■ 4/2013 — Construction start
■ 8/2015 — Substantial completion
■ 10/2015 - Occupancy
a Phasing — 3 phases of construction
o Land costs based upon appraised value plus 25%
a Building Exterior — building image to match
historical downtown
���M��[r 5��6ENT
� � C � IifCTS
19
. 11/14/2011
Budget Components
Police 'Police
Facility `Land Parking 'FirelTraining 'Court *Detention Final Total
519,245,000 5870,000 $1,919,000 $4,223,000 a3,406,000 $3,829,000 s33,492,000
o Cost of Components include:
■ Materials Testing
■ Construction costs
■ Phasing general conditions
■ Contingencies
■ Furniture, Fixtures, & Equipment
■ Professional Services
��i��iEr s��c[rr
� � CMITfCTt
Studied departments not included
in the current project budget
COST ITEM
$1 ,390,000 o City IT department
$ 720,000 o Public Safety Museum at front lobby
$ 265,000 o Dispatch expansion to add City of
Euless
$ 693,000 o LEED enhancements
$ 235,000 o Central plant for mechanical system
■ Lower maintenance costs
■ 7 year utility savings payback
i II I N t l E Y S�II 6 F M 1
� � C � ITECTS
2�
. 11/14/2011
Decision Points
�. Utilize central plant mechanical system to achieve
maintenance and energy savings (7 year payback)?
2. Is LEED certification desired?
��IYNIEI 5�116EN1
� � c � irEeTs
THANK YOU
�