HomeMy WebLinkAboutItem 03 - DFW Connector . �� 9 �lti -�. �- OUR COLOR SCHEME = v�i � � �i � i ����r� �� i �., � :� r� r = � r� �: � �� � PREVIOUSLYCONSTRUCTED = ORAN � E • DETOUR CQNSTRUCTIUN = BLUE r • THE PROJECT CONSISTS OF 7 TOTAL PHASES 1A THRU 3B PHASE 1A OVERVIEW — BEGINS ON THE EAST END OF THE PROJECT EARLY 2010, WESTEND BEGINS MIDTO LATE 2010 — PHASE DURATION APROXIMATELY 550 DAYS — MANY STAGES WITHIN PHASE 1A — MAJOR ITEMS OF WORK INCLUDE • Right of Way (ROW) 67 EA • Utilities 100 EA • Paving Detour 70,000 TONS • Paving Bond Breaker 67,000 TONS • CRCP 140,000 CY • Drainage - RCP 56,000 LF • Drainage - RCB 70,000 LF • Grading - Lime 480,000 SY • Grading - Excavation 1,300,000 CY . , � ort ate onstruct r os NOTIFICATION TOOLS DFW CONNECTOR HOTLINE TOLL FREE: 1-877-411-4212 WWW.DFWCON N ECTOR.COM TxDOT Website HCR Report