• THE PROJECT CONSISTS OF 7 TOTAL PHASES 1A THRU 3B
PHASE 1A OVERVIEW
— BEGINS ON THE EAST END OF THE PROJECT EARLY 2010,
WESTEND BEGINS MIDTO LATE 2010
— PHASE DURATION APROXIMATELY 550 DAYS
— MANY STAGES WITHIN PHASE 1A
— MAJOR ITEMS OF WORK INCLUDE
• Right of Way (ROW) 67 EA
• Utilities 100 EA
• Paving Detour 70,000 TONS
• Paving Bond Breaker 67,000 TONS
• CRCP 140,000 CY
• Drainage - RCP 56,000 LF
• Drainage - RCB 70,000 LF
• Grading - Lime 480,000 SY
• Grading - Excavation 1,300,000 CY
.
,
�
ort ate onstruct r
os