Loading...
HomeMy WebLinkAboutROOF2018-2942 �\ DATE OF ISSUAN(t 0 2 0 F; 4--a- r PERMIT#: BUILDING PERIVIIT APPLICATION (PLEASE PRINT LEGIBLY-COMPLETE ENTIRE FORM) JOB ADDRESS: /j j(� (� SUITE# LOT: BLOCK: SUBDIVISION: BUILDING CONTRACTOR(company name): Cl(Coy CURRENT MAILING ADDRESS: �' 6 q' �­OYYpn CITY/STATE/ZIP: O/&1 S ±X 7 S 2 l PH:#t/Lp /?4 SFax# PROPERTY OWNER: CURRENT MAILING ADDRESS: CITY/STATE/ZIP: PHONE NUMBER: PROJECT VALUE: $ �y�/1 CC2 _ FIRE SPRINKLERED? YES NO WHAT TRADES WILL BE NEEDED? (Check ones that apply)ELECTRIC PLUMBING_ MECHANICAL_ DESCRIPTION OF WORK TO BE DONE: USE OF BUILDING OR STRUCTURE: NAME OF BUSINESS: Total Square Footage under roof: Square Footage of alteration/addition: ❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department(required for new buildings, alterations and additions) ❑ 1 hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: (Not required for 1 &2 family dwellings) ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS,ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGEY(S). PRINT NAME: s/)/rr Jn/dam Np Yr�Z SIGNATURE' PHONE#: d /C/ a () - i g 5- EMAIL: ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction T e: Pen-nit Valuation: $ Setbacks Ap roval to Issue Occupancy Group: Fire S rinkler: YES NO Front: Electrical Division: Building Depth: Left: Plumbing Zoning: Building Width: Rear: Mechanical Occupancy Load: Right: Plan Review Approval: Date: -Building Permit Fee: Site Plan Approval: Date: Plan Review Fee: Fire Department: Date: Lot Drainage Fee: Public Works De artment: Date: Sewer Availability Rate: Health Department: Date: Water Availability Rate: Approved for Permit: Date: Total Fees: Lot Drainage Submitted: Approved: Total Amount Due: PO.BOX%IW,GMPEVINE,T%780%(817)4108165 O'.FORMSUSPERMITAPPLIOATIC S1A er.11/p4 ry �01,��A) It BUILDING ROOFING 9.71C M 1G Issue Date:July 30,2018 PROJECT DESCRIPTION:Residential Re-Roof PROJECT# (817)410-3010 www.mygov.us ROOF-18-2942 Inspections Permits City of Grapevine LOCATION LEGAL P.O.Box 95104 104 Sycamore Grapevine.TX 76099 Silver Lake Estates Addition Bilk 1 Lot 5 Grapevine, TX 76051 No. 1220 Tr 5 (817)410-3165 Voice *07856490* (817)410-3012 Fax CONTRACTOR INFORMATION Halton Negro Roof **APPLICANT NAME Romualdo Martinez 8646 Torreon St. **APPLICANT PHONE NUMBER 214-697-1365 Dallas,TX 75217 (214)697-1365 Phone County Tarrant VALUATION 8000 OWNER Daniel Adair FEES TOTAL=$42.00 104 Sycamore Ct Building Permit Fee($42.00 Flat Fee) $42.00 Grapevine,TX 76051-8259 PAYMENTS TOTAL=$42.00 AVAILABLE INSPECTIONS Halcon Negro Roof(Romualdo Martinez) Building Final(required) Other on 0713012018 ($42.00) Note,CC9491 NOTICES 1)ALL work must be done in compliance with the 2006 INTERNATIONAL BUILDING CODE. 2)A copy of the signed permit and approved plans must be on site at all times. 3)The project address must be clearly posted at the job site. READ AND SIGN I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). � `� ` ar Signature Date MYGOV.US City of Grapevine I BUILDING ROOFING I ROOF-18-29421 Printed 07/30/18 at 3.18 p.m. Page 1 of 2